• Linkedin
  • Youtube
  • Home
  • What we do
  • Projects
  • Pictures
  • Videos
  • News
  • Contact
  • ES
  • FR
Rúbrica Engineering
  • Projects
  • Gallery
  • Videos
MenuClose
  • Home
  • All pictures
  • All Videos
    • Rúbrica Maritime Videos
    • Rúbrica Tunnels Videos
  • Contact
  • Home
  • Job Offers
  • News
  • Política de privacidad
  • Projects
    • Other works
    • Rúbrica Bridges
    • Rúbrica Maritime
    • Rúbrica Tunnels
  • What we do
  • News Highlights
  • Others
  • Rubrica
  • Rubrica Bridge
    • Rubrica Special Projects
  • Rubrica Maritime
  • Rubrica Tunnel
  • Unique Projects
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
COMPETENCE FIELDSClose
  • Projects
  • Gallery
  • Videos
COMPETENCE FIELDS
All
Rubrica Bridges
Rubrica Maritime
Rubrica Tunnels
COUNTRIES
All
Cape Verde
Colombia
Costa Rica
Mexico
Panama
Peru
Portugal
Qatar
Rumania
Spain
UK
Ireland
Israel
Hong Kong (China)
Argelia
France
Reunion Island
Chile
EAU
Escocia
Togo
  • Pile guiding formwork equipment for Paita port by RÚBRICA MARITIME
    Pile guiding formwork equipment for Paita port
  • FRICTION GRIPPER FOR LIFTING 18 T BLOCKS
  • Underwater formwork Sesimbra port by RÚBRICA MARITIME
    Underwater concrete formwork Sesimbra port
  • Formwork for underwater concrete, Palmeira port
  • LEGUTIANO TUNNEL
  • CAPPING BEAM FOR UTE OBRAS ABRIGO - PORT OF VALENCIA
  • Mulatos mine tunnel formwork by RÚBRICA TUNNELS
    Mulatos mine tunnel formwork
  • Tunnel form equipment Prado - Porto by RÚBRICA TUNNELS
    Tunnel form equipment Prado - Porto
  • SELF-LAUNCHING TRUSS CONTECAR
  • Single-arm gripper friction 8 TN by RÚBRICA MARITIME
    Single-arm gripper friction 8 TN
  • VIADUCT BENDICIONES
  • Overhead form traveller Julius Nyerere Hydropower Project (JNHPP) by RÚBRICA BRIDGES
    Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)
  • Traveling shutter formwork in Cisneros/loboguerrero
  • CASTS FOR MANUFACTURING OF ACCROPODE II-TM BLOCKS
  • CUBIC BLOCK CASTS UTE OBRAS DE ABRIGO
  • SEVERAL EQUIPMENT FOR UNDERWATER CONCRETE, GANDIA
  • CAPPING BEAM FOR NEW PORT ENTRANCE AT THE PORT OF VALENCIA
  • Tunnel formwork for Legutiano 2 galleries by RUBRICA TUNNELS
    Tunnel formwork for Legutiano 2 galleries
  • 80 T BLOCK RECOVERY GRIPPER – VALENCIA
  • Formwork traveller for Tunnel Legutiano 2-2 by RÚBRICA TUNNELS
    Formwork traveller for Tunnel Legutiano 2-2
  • Special Form travellers for Mersey Gateway Bridge
    Formwork travelers for Mersey Gateway Bridge
  • Formwork for precast blocks: Accropode II
    Formwork for precast blocks Accropode II
  • Tunnel formwork first Phase in Arguisao
  • Capping beam formwork equipment for Trelleborg Port by RÚBRICA MARITIME
    Capping beam formwork equipment for Trelleborg Port
  • ONTÍGOLA TUNNEL PAVEMENT
  • TÚNEL EN OVIEDO
  • FORMWORK FOR UNDERWATER CONCRETE, PORT OF BARBATE
  • MOTRIL TUNNEL
  • Self-launching falsework Paita port expansion by RÚBRICA MARITIME
    Self-launching falsework Paita port expansion
  • FORMWORK FOR UNDERWATER CONCRETE FOR PORT OF VALENCIA WHARFS
  • Maritime formwork capping beam Haifa, Israel
    Maritime equipment of capping beam Haifa Port
  • Tunnel formwork system for the Rastatt tunnels by RUBRICA TUNNELS
    Tunnel formwork for cross passages
  • 50 T FRICTION GRIPPER PORT OF CIUDADELA, MENORCA (discontinued)
  • Formwork for linning of the Kennedy tunnel by RUBRICA TUNNELS
    Formwork for linning of the Kennedy tunnel
  • SELF-LAUNCHING TRUSS PUERTO DE PAITA
  • Self-launching formwork tunnel equipment La Canda by RÚBRICA TUNNELS
    Self-launching formwork tunnel equipment La Canda
  • Special formwork for precast arch positioning by Rúbrica Engineering
    Special project for precast arch positioning
  • Self-launching falsework Botafoc dock
  • TUNNEL LOBOGUERRERO. CONLÍNEA 2 - COLOMBIA
  • TUNNEL formwork CISNEROS-LOBOGUERRERO (II)
  • FOUR 5 T BLOCKS MULTIPLE GRIPPERS, GARACHICO (discontinued)
  • 10 T CUBIC BLOCK
  • Formwork travelers for A1-M1 Link Road GRNWV Bridge
    Underslung travelers for A1-M1 Link Road GRNWV Bridge
  • Encofrado de encuentro para el túnel de La Línea by RÚBRICA TUNNELS
    Junction Formwork for tunnel La Línea
  • Precast Xbloc Puerto Limón by RÚBRICA MARITIME
    Precast Xbloc Puerto Limón
  • Special formwork anti-scouring matress connection structure, Viaduct Littoral, Reunion Island by RÚBRICA BRIDGES
    Anti-scouring mattress connection structure
  • FORMWORK FOR UNDERWATER CONCRETE
  • CORE - LOC
  • Maritime Formwork underwater form Lome Port by RÚBRICA MARITIME
    Maritime formwork underwater form Lome Port
  • FORMWORK FOR UNDERWATER CONCRETE, ISLAND OF FOGO by RÚBRICA MARITIME
    FORMWORK FOR UNDERWATER CONCRETE, ISLAND OF FOGO
  • INFANTE DON HENRIQUE BRIDGE BY RUBRICA BRIDGES
    INFANTE DON HENRIQUE BRIDGE
  • Tunnel form equipment Deskarga GI-632 by RÚBRICA TUNNELS
    Tunnel form equipment Deskarga GI-632
  • Formwork travelers for Almonte river bridge
  • VILLAPEDRE TUNNEL
  • Special Formwork travellers New Barrow Bridge Ireland by RUBRICA BRIDGES
    Formwork travelers equipment for Rose Fitzgerald Kennedy Bridge
  • 18 T FOUR-SIDED CAST
  • Tunneling solution Túnel Prado by RÚBRICA TUNNELS
    Tunneling solution Túnel Prado
  • 45 T FRICTION GRIPPER (discontinued)
  • Submerged wall formwork Rosario port by RÚBRICA MARITIME
    Submerged wall formwork Rosario port
  • Railway tunnel formwork San Isidro by RÚBRICA TUNNELS
    Railway tunnel formwork San Isidro
  • Underslung form travellers Cebu Link Expressway
    Underslung form traveller Cebu-Cordova Link Expressway
  • Self-launching truss Lázaro-Cárdenas Port
  • CAPPING BEAM ROTA
  • INFANTE DON HENRIQUE ARCH
  • ENCINA-MOGENTE TUNNEL
  • Bored tunnels formwork Piloto de la Línea by RÚBRICA TUNNELS
    Bored tunnel formwork Piloto de la Línea
  • GEREDIAGA TUNNEL
  • BLOCKS OF DIFFERENT TYPES FOR GRAVITY WALL, QATAR
  • Self-supporting formwork tunnel Tesalia by Rúbrica Engineering
    Self-supporting formwork equipment tunnel Tesalia
  • SUCCESSIVE CANTILEVER BRIDGE OVER THE TAGUS RIVER
  • Tunnel formwork equipment La Línea section tolima 2 by RÚBRICA TUNNELS
    Tunnel formwork equipment La Línea section tolima 2
  • ACRÓPODO I
  • SHOULDER NEW PORT ENTRANCE VALENCIA
  • Bored tunnel formwork for the A-21 highway in Yesa
  • HSR tunnel formwork Mondragón-Elorrio-Bergara by RÚBRICA TUNNELS
    HSR tunnel formwork Mondragón-Elorrio-Bergara
  • Tunnel formwork for Uribarri
  • ACROPODO II
  • Special Formwork travellers Atlantic Bridge Panmá by RUBRICA BRIDGES
    Special formwork travellers for Atlantic bridge
  • Finishing platform Forth Crossing Edimburgo by RÚBRICA BRIDGES
    Finishing platform Forth Crossing
  • Form traveller for Cut-and-cover Tunnel, GI-632 highway
  • RECOVERY GRIPPER, SINES
  • VIADUCT OVER TAGUS RIVER. CART FOR CONSTRUCTION OF THE ARCH
  • Maritime formwork Crown wall, Haifa Port
  • 22 T EDGE SLAB CAST
  • Single-arm gripper friction 17 TN Mallorca port by RÚBRICA MARITIME
    Single-arm gripper friction 17 TN Mallorca port
  • Self-supporting formwork tunnel Boughezoul-Djelfa
  • Special wings Formwork travellers for Mersey Gateway Bridge
    Wings formwork travellers for Mersey Gateway Bridge
  • LEGUTIANO 2 TUNNEL
  • BOX GRIPPERS PORT OF MENORCA (discontinued)
  • Self-supporting tunnel formwork formwork La línea - Carmelitas by RÚBRICA TUNNELS
    Bored tunnel formwork La línea - Carmelitas
  • Traveling shutters formwork Urdinbibe by Rúbrica Tunnels
    Traveling shutters formwork Urdinbide
  • SUBMERGED WALL PALMA DE MALLORCA
  • Wall formwork and curve slab for buried hydraulic conduit by RÚBRICA MARITIME
    Wall formwork and curve slab for buried hydraulic conduit
  • Formwork for precast blocks 8 Tn by RÚBRICA MARITIME
    Formwork for precast blocks 8 Tn
  • 80 T SINGLE-ARM GRIPPER - SINES
  • Maritime formwork Single-arm gripper friction 50tn (discontinued)
  • SHOULDER AT U.T.E. LANGOSTEIRA
  • BREAKWATER VALENCIA PROTECTION WORKS
  • 10 TN BOX GRIPPER (discontinued)
  • CAPPING BEAM CART, QATAR
  • Capping beam equipment for Gävle Port by RÚBRICA MARITIME
    Capping beam equipment for Gävle Port
  • TZ TRUSSES for Guadalhorce viaduct
  • 60 T FRICTION GRIPPER, GARACHICO (discontinued)
  • EXTENSION EAST DOCK, CASTELLON
  • Formwork platform for Atlantic bridge
    Finishing platform for Atlantic Bridge
  • Maritime formworks `Dolphin Moorings´ for Botafoc Marina
    Maritime formworks `Dolphin Moorings´ for Botafoc Marina
  • Tunnels forms curved slab by RÚBRICA MARITIME
    Tunnel formwork Princess Hill
  • FLOATING FORMWORK, Mallorca Port
  • CAPPING BEAM FOR PORT OF VILAGARCÍA DE AROUSA
  • CAPPING BEAM FOR PORT MARÍN
  • ARGISAO TUNNEL
  • Self-launching formwork tunnel equipment La Línea by RÚBRICA TUNNELS
    Self-launching formwork tunnel equipment La Línea
  • ONTÍGOLA TUNNEL INVERTED VAULT
  • Tunnel formwork first Phase in Motril
  • Formwork traveller in Madre Laura Bridge by RUBRICA BRIDGES
    Formwork traveller in Madre Laura Bridge
  • VALENCIA PROTECTION WORKS SHOULDER
  • SPECIAL FORMWORK TRAVELLERS VIADUCT OVER NARCEA RIVER
  • Self launching formwork tunnel 8 Helios by Rubrica Engineering
    Self-launching formwork tunnel Helios Ruta del Sol
  • EXTENSION OF EL MUSEL PORT - GIJÓN.
  • Tunnel form Buenavista, Colombia by RÚBRICA TUNNELS
    Mine tunnel formwork in Buenavista
  • CAST FORMWORK FOR 60 T ANTIFER BLOCK
  • Maritime formwork Syncrolift Port Barcelona by Rúbrica Maritime
    Maritime formwork Syncrolift, Barcelona Port
  • SELF-LAUNCHING TRUSS SINES
  • Bored tunnel form Caldearenas
  • Maritime formwork Single-arm gripper 20tn (discontinued)
  • Vertical wavewall formwork Marina Bay D´alger by RUBRICA MARITIME
    Maritime formwork Crown wall Marina Bay D´Alger

WE COOPERATE WITH / OUR PARTNERS | AWARDS

Av. Hermanos Bou, 246 12003
Castellón (Spain)
Tel +34 964 28 02 40
Fax. +34 964 28 18 07

LATEST POSTS
Tunnel formwork for the construction of the connecting galleries in the Rastatt tunnels

Tunnel formwork The project has 8 connecting galleries with similar geometries but different dimensions between them. The construction of each gallery is divided into four phases of execution due to the fact that it has different sections. The 4 phases of the 8...

Tunnel opened – new tunnel formwork in assembly

In a few days, the short tunnel of the Line - Carmelitas (Túneles Proyecto Consorcio La Línea 042) will enter into service. This infrastructure is included within the well-known “Cruce de la Cordillera Central” project, which, together with others, will facilitate...

Specialized in self-supporting tunnel formwork

Self-supporting tunnel formwork is a system for casting the tunnel vault. It is robust and reliable, and moves autonomously over the grade, attaching itself to the base beam during the casting process. It consists of a shell or metal mold formed by modular panels that...

Assembly of the Pamplona Tunnel formwork

Assembly description of the Pamplona Tunnel formwork Tunnel formwork in mine for the construction work of the Pamplona - Cúcuta highway located in Colombia. The formwork of 15 m and radius 5.56 m has been supplied that circulates on railroad track, and whose main...

Starting the works with the pile guidance structure in Paita (Perú)

The pile guidance structure designed for the extension of the quay on piles to be executed by Etermar in the port of Paita, Peru, has already begun to operate with the driving of the first piles next to the existing pier.  

LINKS
  • Home
  • What we do
  • Projects
  • News
  • Contact
LEGAL
  • Legal notice
  • Privacy policy

© Copyright 2020 Rúbrica Engineering. Legal notice

  • Follow
  • Follow