New special project finished in Abu Dhabi
Please see our new special project finished, precast arch positioning in our projects section: See the project
Status Consorcio Vía Al Mar 1 Bridge, Colombia
The Prosperity Highway project has as its main objective to generate a road interconnection between the city of Medellín with the main highway concessions in the country, and which, in turn, connect it with the main commercial exchange centers such as the Caribbean...
Formworks travelers for two different types of reinforced concrete arch bridges
(Only available in english - solo disponible en inglés) Rúbrica Engineering were in the last Arch 2019 (9th international conference on arch bridges) in Porto. Here you are the article presented on the Conference. Formworks travelers for two different types of...
Assembly form travelers Cebulink bridge
Last finishing platform
Last finishing platform for Forth Crossing bridge in Edinburgh. We did it!
Time-lapse pre-assembly Cebu Link Expressway Main Bridge
Preassembly of one of the symmetrical halves that form the inner formwork for the Cebu Link Expressway main bridge. In the preassembly a simulation of the movement the formwork will have to do is conducted to test its correct operation. Due to the situation of the...
Starting works of the finishing platform in Edinburgh
The assembly of the Finishing Platform has begun in Edinburgh. There are 3 platforms of 40m each, which will provide access to workers on the bottom surface of the already finished deck of Queensferry Crossing Bridge.
On good form
Article published on Bridge magazine
Time-lapse of our Lifting structure in Viaduc Littoral
Time-lapse of our Lifting structure designed to carry a load up to 1900tn is on the submersible platform. Rúbrica Ingeniería design and produce special formworks & special structures for unique solutions.