• Linkedin
  • Youtube
  • Home
  • What we do
  • Projects
  • Pictures
  • Videos
  • News
  • Contact
  • ES
  • FR
Rúbrica Engineering
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIMA
COMPETENCE FIELDSClose
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
  • Projects
  • Gallery
  • Videos
MenuClose
  • Home
  • All pictures
  • All Videos
    • Rúbrica Maritime Videos
    • Rúbrica Tunnels Videos
  • Contact
  • Home
  • Job Offers
  • News
  • Política de privacidad
  • Projects
    • Other works
    • Rúbrica Bridges
    • Rúbrica Maritime
    • Rúbrica Tunnels
  • What we do
  • News Highlights
  • Others
  • Rubrica
  • Rubrica Bridge
    • Rubrica Special Projects
  • Rubrica Maritime
  • Rubrica Tunnel
  • Unique Projects
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
COMPETENCE FIELDSClose
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIMA
  • El puente que España ha construido en Filipinas (Cebú). CCLEX (Cebu-Cordova Link Expressway)
  • CCLEX construction update for July 2021
  • National Geographic features CCLEX: Advanced Construction Technology Meets Global Expertise
  • CCLEX SUNRISE | BIRD'S EYE VIEW | CONNECTED | OCTOBER 7, 2021
  • #TIMELAPSE of the construction of the Cebu cable-stayed #bridge | ACCIONA
  • CCLEX 4K |TWIN TOWERS |52 OUT 56 STAY-CABLES |AUGUST 14, 2021 #progressupdate
  • MAIN BRIDGE GAPS INCHING MORE CLOSER |CCLEX 4K |AUGUST 8, 2021 #aerialprogressupdate
  • CCLEX | AN AERIAL TOUR | CORDOVA TO CEBU CITY SIDE #iconicbridge
  • BEST CCLEX UPDATE | DETAILED CLEAR UP-CLOSE & SAME DAY EDIT UPLOAD
  • CCLEX |4K AERIAL PROGRESS UPDATE |MAY 24, 2021 #iconicbridge
  • CCLEX DRONE&DRIVE 4K| BRIDGE OF TOMORROW |MAY2021 #cinematic
  • A Montage of Cebu-Cordova Link Expressway Progress
  • A Montage of the Cebu-Cordova Link Expressway
  • PROIN3D: VIADUCTO DEL ALMONTE (LAV EXTREMADURA). 2014
  • N25 Progress Presentation Video September 2019
  • Rose Fitzgerald Kennedy Bridge April 2019
  • Rose Fitzgerald Bridge May 2019
  • The Rose Fitzgerald Kennedy Bridge
  • The Rose Fitzgerald Kennedy Bridge June 2019.
  • Queensferry Crossing finishing platform (2)
  • Time-lapse pre-assembly Cebulink Expressway Main Bridge
  • Video-render Anti-scouring Mattress Connection Structure
  • New Ross N25 Bypass 01.10.2018 Drone overview
  • Queensferry Crossing finishing platform (1)
  • The Rose Fitzgerald Kennedy Bridge
  • New Ross Bypass Bridge
  • New Ross bypass bridge
  • New Ross Bypass December 2018
  • New Ross Bypass Bridge over 10 months April 18 - February 19
  • New Ross Bypass - Rose Fitzgerald Kennedy Bridge By Drone
  • Panama Atlantic Bridge - Equipage mobile
  • New Ross Rose Fitzgerald Kennedy bridge N25 construction update 04.02.2019
  • Overview project Atlantic Bridge
  • 2 st Lifting Operation, Atlantic Bridge
  • 1 st Lifting Operation, Atlantic Bridge (Panamá)
  • Trial Assembly vertical movement (2), Mersey Gateway Bridge
  • Trial assembly horizontal movement, Mersey Gateway Bridge
  • Trial assembly vertical movement (1), Mersey Gateway Bridge
  • FT PT works Mersey Gateway Bridge
  • FT working process Mersey Gateway Bridge (UK)
  • FT Launching Viaduct Tajo
  • FT Dimensions Almonte Bridge
  • Formwork Traveler launching Almonte Bridge
  • 2018 ACI Excellence Awards - Overall Winner: Viaduct Over River Almonte
  • Mersey Gateway - lifting the form traveller at the south pylon - 8 April 2016
  • New Ross Bypass - The Longest Bridge Of It's Kind In The World
  • Time-lapse lifting Anti-scouring Mattress Connection Structure
  • Viaducto Narcea CFCSL
  • RUBRICA BRIDGES: last Special Projects in formwork equipment for in-place casting (ok)
  • Focus on Precast Skidding Device / Présentation du système de ripage des precasts
  • Closing in Atlantic Bridge Panamá
  • Puente sobre el río Tajo en el embalse de Alcántara
  • PUENTE MADRE LAURA MEDELLIN - TOMAS AEREAS
  • N25 By pass New Ross drone overview. 29.05.2018 Update
  • ATLANTIC BRIDGE (Panamá) (video 4): our travelers working in the construction a cable stayed bridge
  • ATLANTIC BRIDGE (Panamá) (video 3): Travelers First Lifting
  • ATLANTIC BRIDGE (Panamá) (video 2): continuing the works
  • Wing and Traveler working in Mersey Gateway Bridge (Liverpool) by RUBRICA BRIDGES
  • ATLANTIC BRIDGE (Panamá) (video 0) Time-lapse about the inner formwork preassembly
  • Vídeo render Traveller Formwork by RUBRICA BRIDGES
  • MERSEY GATEWAY BRIDGE (UK) (Video 1): out form traveller working on site...
  • ALMONTE BRIDGE (Spain) (Video 4): New video
  • Walking to the traveller...
  • ALMONTE BRIDGE (Spain) (Video 3): Closing the arch
  • TAGUS VIADUCT: remastered video viaduct over Tagus river by RUBRICA BRIDGES
  • ALMONTE BRIDGE (Spain) (Video 2): Our travelers working by night (time lapse video)
  • Remasterized video Arch Bridges by RUBRICA BRIDGES
  • ATLANTIC BRIDGE (Panamá) (video 1): starting the works
  • Equipos ejecución arco río Tajo
  • ALMONTE BRIDGE (Spain) (video 1): Our travelers working...

WE COOPERATE WITH / OUR PARTNERS | AWARDS

Av. Hermanos Bou, 246 12003
Castellón (Spain)
Tel +34 964 28 02 40
Fax. +34 964 28 18 07

LATEST POSTS
First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel

(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel) The Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the Vías Mar 1 and Mar...

Tunnel formwork for the construction of the connecting galleries in the Rastatt tunnels

Tunnel formwork The project has 8 connecting galleries with similar geometries but different dimensions between them. The construction of each gallery is divided into four phases of execution due to the fact that it has different sections. The 4 phases of the 8...

Tunnel opened – new tunnel formwork in assembly

In a few days, the short tunnel of the Line - Carmelitas (Túneles Proyecto Consorcio La Línea 042) will enter into service. This infrastructure is included within the well-known “Cruce de la Cordillera Central” project, which, together with others, will facilitate...

Specialized in self-supporting tunnel formwork

Self-supporting tunnel formwork is a system for casting the tunnel vault. It is robust and reliable, and moves autonomously over the grade, attaching itself to the base beam during the casting process. It consists of a shell or metal mold formed by modular panels that...

Assembly of the Pamplona Tunnel formwork

Assembly description of the Pamplona Tunnel formwork Tunnel formwork in mine for the construction work of the Pamplona - Cúcuta highway located in Colombia. The formwork of 15 m and radius 5.56 m has been supplied that circulates on railroad track, and whose main...

LINKS
  • Home
  • What we do
  • Projects
  • News
  • Contact
LEGAL
  • Legal notice
  • Privacy policy

© Copyright 2020 Rúbrica Engineering. Legal notice

  • Follow
  • Follow