• Linkedin
  • Youtube
  • Home
  • What we do
  • Projects
  • Pictures
  • Videos
  • News
  • Contact
  • ES
  • FR
Rúbrica Engineering
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
COMPETENCE FIELDSClose
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
  • Projects
  • Gallery
  • Videos
MenuClose
  • Home
  • All pictures
  • All Videos
    • Rúbrica Maritime Videos
    • Rúbrica Tunnels Videos
  • Contact
  • Home
  • Job Offers
  • News
  • Política de privacidad
  • Projects
    • Other works
    • Rúbrica Bridges
    • Rúbrica Maritime
    • Rúbrica Tunnels
  • What we do
  • News Highlights
  • Others
  • Rubrica
  • Rubrica Bridge
    • Rubrica Special Projects
  • Rubrica Maritime
  • Rubrica Tunnel
  • Unique Projects
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
COMPETENCE FIELDSClose
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS

Filter Categories
All
Bored Tunnels
Formwork 1st phase
Other Works
  • Tunnel formwork system for the Rastatt tunnels by RUBRICA TUNNELS
    Galleries

    SPECIAL PROJECT

    Tunnel formwork for cross passages

    Germany

  • Tunnel formwork equipment La Línea section tolima 2 by RÚBRICA TUNNELS
    Tunnel formwork equipment La Línea section tolima 2

    Colombia

  • Self-supporting tunnel formwork formwork La línea - Carmelitas by RÚBRICA TUNNELS
    Bored tunnel formwork La línea - Carmelitas

    Colombia

  • Self-launching formwork tunnel equipment La Línea by RÚBRICA TUNNELS
    Formwork 1st phase
    Self-launching formwork tunnel equipment La Línea

    Colombia

  • Tunneling solution Túnel Prado by RÚBRICA TUNNELS
    Formwork 1st phase
    Tunneling solution Túnel Prado

    España

  • Tunnel form equipment Prado - Porto by RÚBRICA TUNNELS
    Formawork 1st phase
    Tunnel form equipment Prado - Porto

    España

WE COOPERATE WITH / OUR PARTNERS | AWARDS

Av. Hermanos Bou, 246 12003
Castellón (Spain)
Tel +34 964 28 02 40
Fax. +34 964 28 18 07

LATEST POSTS
First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel

(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel) The Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the Vías Mar 1 and Mar...

Tunnel formwork for the construction of the connecting galleries in the Rastatt tunnels

Tunnel formwork The project has 8 connecting galleries with similar geometries but different dimensions between them. The construction of each gallery is divided into four phases of execution due to the fact that it has different sections. The 4 phases of the 8...

Tunnel opened – new tunnel formwork in assembly

In a few days, the short tunnel of the Line - Carmelitas (Túneles Proyecto Consorcio La Línea 042) will enter into service. This infrastructure is included within the well-known “Cruce de la Cordillera Central” project, which, together with others, will facilitate...

Specialized in self-supporting tunnel formwork

Self-supporting tunnel formwork is a system for casting the tunnel vault. It is robust and reliable, and moves autonomously over the grade, attaching itself to the base beam during the casting process. It consists of a shell or metal mold formed by modular panels that...

Assembly of the Pamplona Tunnel formwork

Assembly description of the Pamplona Tunnel formwork Tunnel formwork in mine for the construction work of the Pamplona - Cúcuta highway located in Colombia. The formwork of 15 m and radius 5.56 m has been supplied that circulates on railroad track, and whose main...

LINKS
  • Home
  • What we do
  • Projects
  • News
  • Contact
LEGAL
  • Legal notice
  • Privacy policy

© Copyright 2020 Rúbrica Engineering. Legal notice

  • Follow
  • Follow