Tunneling solution Túnel Prado

 



Tunneling solution Túnel Prado

Customer: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Location: Vilar de Barrio (Orense)
Year: 2015

Description:

Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)

IDENTIFIED NEEDS:
Self-supporting equipment composed of 4 formwork and 2 transfer cars, R = 4.37 / 8.81m, advance 15m. and formwork for the execution of the 1st phase of the tunnel lining, (30 + 30m.)

Tunneling solution Túnel Prado

Customer: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Location: Vilar de Barrio (Orense)
Year: 2015

Description:

Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)

IDENTIFIED NEEDS:
Self-supporting equipment composed of 4 formwork and 2 transfer cars, R = 4.37 / 8.81m, advance 15m. and formwork for the execution of the 1st phase of the tunnel lining, (30 + 30m.)

SEE WHAT ELSE WE’VE BEEN DOING


Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles.