Tunneling solution Túnel Prado

 



Tunneling solution Túnel Prado

Customer: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Location: Vilar de Barrio (Orense)
Year: 2015

Description:

Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)

IDENTIFIED NEEDS:
Self-supporting equipment composed of 4 formwork and 2 transfer cars, R = 4.37 / 8.81m, advance 15m. and formwork for the execution of the 1st phase of the tunnel lining, (30 + 30m.)

Tunneling solution Túnel Prado

Customer: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Location: Vilar de Barrio (Orense)
Year: 2015

Description:

Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)

IDENTIFIED NEEDS:
Self-supporting equipment composed of 4 formwork and 2 transfer cars, R = 4.37 / 8.81m, advance 15m. and formwork for the execution of the 1st phase of the tunnel lining, (30 + 30m.)

SEE WHAT ELSE WE’VE BEEN DOING