Maritime formwork Syncrolift, Barcelona Port
Customer: UTE Syncrolift
Country: Spain
Location: Puerto de Barcelona
Year: 2016
Description:
One team worked doing a whole dock continuously, while in the symmetrical dock was executed with two teams, the first that worked in the construction of the syncrolift area, and the second behind completing the section of the dock.
IDENTIFIED NEEDS:
What was the challenge?:
Maritime formwork Syncrolift, Barcelona Port
Customer: UTE Syncrolift
Country: Spain
Location: Puerto de Barcelona
Year: 2016
Description:
One team worked doing a whole dock continuously, while in the symmetrical dock was executed with two teams, the first that worked in the construction of the syncrolift area, and the second behind completing the section of the dock.
IDENTIFIED NEEDS:
What was the challenge?: