Maritime formwork Syncrolift, Barcelona Port
Client: UTE Syncrolift
Country: Spain
Emplacement: Puerto de Barcelona
année : 2016
La description:
One team worked doing a whole dock continuously, while in the symmetrical dock was executed with two teams, the first that worked in the construction of the syncrolift area, and the second behind completing the section of the dock.
BESOINS IDENTIFIÉS:
Quel était le défi?:
Maritime formwork Syncrolift, Barcelona Port
Client: UTE Syncrolift
Country: Spain
Emplacement: Puerto de Barcelona
année : 2016
La description:
One team worked doing a whole dock continuously, while in the symmetrical dock was executed with two teams, the first that worked in the construction of the syncrolift area, and the second behind completing the section of the dock.
BESOINS IDENTIFIÉS:
Quel était le défi?: