Wings formwork travellers for Mersey Gateway Bridge
Client: Merseylink
Country: UK
Emplacement: Widnes, (Liverpool)
année : 2015 to 2017
La description:
Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.
Quel était le défi?:
Wings formwork travellers for Mersey Gateway Bridge
Client: Merseylink
Country: UK
Emplacement: Widnes, (Liverpool)
année : 2015 to 2017
La description:
Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.
Quel était le défi?:
VOIR CE QUE NOUS AVONS FAIT D’AUTRE
-
France
-
Philippines
-
Scotland