Capping beam equipment for Gävle Port

 



Capping beam equipment for Gävle Port

Client: Rover Maritime
Country: Suecia
Emplacement: Gävle Port
année : 2019

La description:

The equipment is made up of four clearly differentiated parts:
1. Interior panel for concreting the internal face of the screen wall in the area of the existing dock.
2. Exterior panel for concreting the exterior panel in two phases.
3. Transport trolley that supports the concreting loads of the exterior and interior panel and allows the transfer of the equipment thanks to the wheels supported on the tracks.
4. Front stopend

BESOINS IDENTIFIÉS:
The configuration and adjustment of the equipment in the new start should be as fast as possible, to reduce the execution times of the work and compensate for the inevitable winter stoppage when the sea freezes.

Quel était le défi?:
Design a configurable formwork for both sections with the minimum amount of changes.

Capping beam equipment for Gävle Port

Client: Rover Maritime
Country: Suecia
Emplacement: Gävle Port
année : 2019

La description:

The equipment is made up of four clearly differentiated parts:
1. Interior panel for concreting the internal face of the screen wall in the area of the existing dock.
2. Exterior panel for concreting the exterior panel in two phases.
3. Transport trolley that supports the concreting loads of the exterior and interior panel and allows the transfer of the equipment thanks to the wheels supported on the tracks.
4. Front stopend

BESOINS IDENTIFIÉS:
The configuration and adjustment of the equipment in the new start should be as fast as possible, to reduce the execution times of the work and compensate for the inevitable winter stoppage when the sea freezes.

Quel était le défi?:
Design a configurable formwork for both sections with the minimum amount of changes.