• Linkedin
  • Youtube
  • Home
  • What we do
  • Projects
  • Pictures
  • Videos
  • News
  • Contact
  • ES
  • FR
Rúbrica Engineering
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
COMPETENCE FIELDSClose
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
  • Projects
  • Gallery
  • Videos
MenuClose
  • Home
  • All pictures
  • All Videos
    • Rúbrica Maritime Videos
    • Rúbrica Tunnels Videos
  • Contact
  • Home
  • Job Offers
  • News
  • Política de privacidad
  • Projects
    • Other works
    • Rúbrica Bridges
    • Rúbrica Maritime
    • Rúbrica Tunnels
  • What we do
  • News Highlights
  • Others
  • Rubrica
  • Rubrica Bridge
    • Rubrica Special Projects
  • Rubrica Maritime
  • Rubrica Tunnel
  • Unique Projects
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
COMPETENCE FIELDSClose
  • COMPETENCE FIELDS
    • RÚBRICA BRIDGES
    • RÚBRICA TUNNELS
    • RÚBRICA MARITIME
    • OTHER WORKS
COMPETENCE
All
Special Project
  • Tunnel formwork system for the Rastatt tunnels by RUBRICA TUNNELS
    Galleries

    SPECIAL PROJECT

    Tunnel formwork for cross passages

    Germany

  • Formwork for precast blocks: Accropode II
    Formwork for precast blocks Accropode II

    Rumania

  • Formwork travelers for A1-M1 Link Road GRNWV Bridge
    Underslung travelers for A1-M1 Link Road GRNWV Bridge

    Republic of Mauritius

  • Overhead form traveller Julius Nyerere Hydropower Project (JNHPP) by RÚBRICA BRIDGES
    Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)

    Tanzania

  • Underslung form travellers Cebu Link Expressway

    SPECIAL PROJECT

    Underslung form traveller Cebu-Cordova Link Expressway

    Filipinas

  • Self-launching falsework Paita port expansion by RÚBRICA MARITIME
    Self-launching falsework Paita port expansion

    Perú

WE COOPERATE WITH / OUR PARTNERS | AWARDS

Av. Hermanos Bou, 246 12003
Castellón (Spain)
Tel +34 964 28 02 40
Fax. +34 964 28 18 07

LATEST POSTS
Tunnel formwork for the construction of the connecting galleries in the Rastatt tunnels

Tunnel formwork The project has 8 connecting galleries with similar geometries but different dimensions between them. The construction of each gallery is divided into four phases of execution due to the fact that it has different sections. The 4 phases of the 8...

Tunnel opened – new tunnel formwork in assembly

In a few days, the short tunnel of the Line - Carmelitas (Túneles Proyecto Consorcio La Línea 042) will enter into service. This infrastructure is included within the well-known “Cruce de la Cordillera Central” project, which, together with others, will facilitate...

Specialized in self-supporting tunnel formwork

Self-supporting tunnel formwork is a system for casting the tunnel vault. It is robust and reliable, and moves autonomously over the grade, attaching itself to the base beam during the casting process. It consists of a shell or metal mold formed by modular panels that...

Assembly of the Pamplona Tunnel formwork

Assembly description of the Pamplona Tunnel formwork Tunnel formwork in mine for the construction work of the Pamplona - Cúcuta highway located in Colombia. The formwork of 15 m and radius 5.56 m has been supplied that circulates on railroad track, and whose main...

Starting the works with the pile guidance structure in Paita (Perú)

The pile guidance structure designed for the extension of the quay on piles to be executed by Etermar in the port of Paita, Peru, has already begun to operate with the driving of the first piles next to the existing pier.  

LINKS
  • Home
  • What we do
  • Projects
  • News
  • Contact
LEGAL
  • Legal notice
  • Privacy policy

© Copyright 2020 Rúbrica Engineering. Legal notice

  • Follow
  • Follow