Assembly of the Pamplona Tunnel formwork

Assembly of the Pamplona Tunnel formwork

Assembly description of the Pamplona Tunnel formwork Tunnel formwork in mine for the construction work of the Pamplona - Cúcuta highway located in Colombia. The formwork of 15 m and radius 5.56 m has been supplied that circulates on railroad track, and whose main...

Report RÚBRICA TUNNELS 2018

Report RÚBRICA TUNNELS 2018

Rúbrica Ingeniería, thanks to its division RÚBRICA TUNNELS, and through its subsidiary in Colombia RÚBSTER, consolidates the growth in that country, positioning itself as the reference brand in engineering solutions for tunneling equipment. Among the main civil works...