We are delighted to share the exciting news of our collaboration on the impressive Fehmarnbelt Tunnel, the world's longest immersed tunnel!. Meva Formworks has partnered with Rúbrica to supply the necessary formwork for the construction of the 10 special elements of...
First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel
(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel) The Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the Vías Mar 1 and Mar...
Tunnel formwork for the construction of the connecting galleries in the Rastatt tunnels
Tunnel formwork The project has 8 connecting galleries with similar geometries but different dimensions between them. The construction of each gallery is divided into four phases of execution due to the fact that it has different sections. The 4 phases of the 8...
Tunnel opened – new tunnel formwork in assembly
In a few days, the short tunnel of the Line - Carmelitas (Túneles Proyecto Consorcio La Línea 042) will enter into service. This infrastructure is included within the well-known “Cruce de la Cordillera Central” project, which, together with others, will facilitate...
Specialized in self-supporting tunnel formwork
Self-supporting tunnel formwork is a system for casting the tunnel vault. It is robust and reliable, and moves autonomously over the grade, attaching itself to the base beam during the casting process. It consists of a shell or metal mold formed by modular panels that...
Assembly of the Pamplona Tunnel formwork
Assembly description of the Pamplona Tunnel formwork Tunnel formwork in mine for the construction work of the Pamplona - Cúcuta highway located in Colombia. The formwork of 15 m and radius 5.56 m has been supplied that circulates on railroad track, and whose main...
Short tunnels Quindio Sector´s (Colombia)
The assembly and first laying of the "Expanded Sector" of the work has already been carried out. This tunnel has three sections of different sizes. We have designed a shell that fits the two larger ones and a second shell for the small one, while the transfer formwork...
(only in spanish version) – Artículo revista ROP Septiembre 2019
Rapport Rúbrica Tunnels 2018
Rúbrica Ingeniería, via son département RÚBRICA TÚNELES et sa filiale en Colombie RÚBSTER, consolide la croissance dans ce pays se positionnant comme la marque de référence en solutions d’ingénierie d’équipements de coffrages pour tunnels. Parmi les principaaux...
Construction du coffrage pour le tunnel de Mulatos (Colombie)
Équipe composée d’un coffrage et d’un charriot de translation de 6,40 et 4,66 m de rayon respectivement et d’une longueur de 15 m divisible en deux coffrages indépendants de 9 et 6 m. Elle est fournie avec un coffrage pour l’exécution de la poutre de fondation ou...