Placement of the capping beam in the start section of the Q8 alignment of the Haifa Port expansion.
New project: Capping beam in Haifa (Israel)
Haifa Port is the greatest maritime port of Israel, with 22 mill tn of load. On this ocassion, Rubrica Engineering has designed and manufatured an ad hoc solution of capping beam as a fundamental element of protection against the sea. The formwork panels are there, so...
RUBRICA TRAINING, STRAIN GAUGES COURSE
Yesterday our main engineers team completed the strain gauges course thanks our external collaborator HMM. It is the monitoring system of the structure load, which we will implement in our projects thanks to an online app through which we will know the load level of...
RUBRICA QUALITY INFORM
One of the most relevant Rubrica Ingeniería Quality Management System procedures is the Customer Satisfaction one. Once the execution of our services have been finished, it is essential for us to find out our customers perception, so we can reach the continual...
RUBRICA QUALITY INFORM
Rubrica is currently doing the formal implementation of the Quality Management System according to the UNE-EN ISO 9001 regulatory requirements. In order to do that all the procedures and work instructions with the description of our activities have been developed,...
RÚBRICA AT PIANC, SAN FRANCISCO
Last June, two of our senior managers attended the 33rd PIANC World Congress in San Francisco, USA. Rúbrica wanted to participate as an exhibitor, and took the opportunity to show the American market its portfolio of maritime works, in addition to presenting our three...
BAUMA 2013
BAUMA 2013 15-21 APRIL VISIT US: HALL A2 BOOTH 321
COMPLETION OF SEAPORT PIER WITH THE INNOVATIVE SELF-LAUNCHING TRUSS SYSTEM
The seaport pier construction in Sines (Portugal) has been completed, where our self-launching truss (patented model) has been used. With this system we manage to construct a monolithic pier between expansion joints, and thus achieve a more structurally stable element...
THE 1ST CONCRETE BLOCK RECOVERY GRIPPER IS ALREADY ON SITE.
This gripper supplied for this construction is able to retrieve blocks of up to 80 tons. This new single-arm gripper system lets us adapt to the difficult situations it is subjected to, in order to rescue concrete blocks in an exceptional way. One of the advantages of...