Capping beam equipment for Gävle Port
Customer: Rover Maritime
Country: Suecia
Location: Gävle Port
Year: 2019
Description:
The equipment is made up of four clearly differentiated parts:
1. Interior panel for concreting the internal face of the screen wall in the area of the existing dock.
2. Exterior panel for concreting the exterior panel in two phases.
3. Transport trolley that supports the concreting loads of the exterior and interior panel and allows the transfer of the equipment thanks to the wheels supported on the tracks.
4. Front stopend
IDENTIFIED NEEDS:
What was the challenge?:
Capping beam equipment for Gävle Port
Customer: Rover Maritime
Country: Suecia
Location: Gävle Port
Year: 2019
Description:
The equipment is made up of four clearly differentiated parts:
1. Interior panel for concreting the internal face of the screen wall in the area of the existing dock.
2. Exterior panel for concreting the exterior panel in two phases.
3. Transport trolley that supports the concreting loads of the exterior and interior panel and allows the transfer of the equipment thanks to the wheels supported on the tracks.
4. Front stopend
IDENTIFIED NEEDS:
What was the challenge?: