Tel. +34 964 28 02 40

Finishing platform Forth Crossing

  Rubrica Bridges

SPECIAL PROJECT
Customer: Forth Crossing Bridge Contractors (FCBC)

Scotland

Location: Queensferry, Edinburgh
Year: 2019
KEY FACTS:
Very short delivery time, hanging system conditioned by customer anchoring points, limitations of reactions at hanging points.
IDENTIFIED NEEDS:
Access to the bottom of the deck with a secure system of 3 load levels; elevators to be able to take the load to the different levels; access from auxiliary platform and from deck; high wind loads.

What was the challenge?:
Design a support system compatible with the limitations of the hanging points in the required time

Description:

There are 3 platforms of 40m each with a structure frame-beam shape, which will provide access to workers on the bottom surface of the already finished deck of Queensferry Crossing Bridge.