GEREDIAGA TUNNEL
Customer: UTE Autovía Gerediaga - Elorrio
Country: SPAIN
Location: Albadiño (Bizkaia)
Year: 2014 to 2015
Description:
This is a formwork for the lining both of the bored tunnel and the cut-and-cover tunnel. In both cases, along the tunnel route, there are areas where the tunnel section expands laterally (sidings).
The cut-and-cover tunnel would be carried out in two phases; the first one with the concreting of the cut-and-cover tunnel itself, through the inner-outer formwork and a larger bored inner section than that of the tunnel; and afterwards, the cut-and-cover tunnel would be lined in order to achieve the same finish and section as that of the bored tunnel.
GEREDIAGA TUNNEL
Customer: UTE Autovía Gerediaga - Elorrio
Country: SPAIN
Location: Albadiño (Bizkaia)
Year: 2014 to 2015
Description:
This is a formwork for the lining both of the bored tunnel and the cut-and-cover tunnel. In both cases, along the tunnel route, there are areas where the tunnel section expands laterally (sidings).
The cut-and-cover tunnel would be carried out in two phases; the first one with the concreting of the cut-and-cover tunnel itself, through the inner-outer formwork and a larger bored inner section than that of the tunnel; and afterwards, the cut-and-cover tunnel would be lined in order to achieve the same finish and section as that of the bored tunnel.
SEE WHAT ELSE WE’VE BEEN DOING
-
France
-
Philippines
-
Scotland
-
Reunion Island
-
Hong Kong
-
PORTUGAL