Bridge cantilever formwork Boquerón, Sapuyes and Porvenir section

 



Bridge cantilever formwork Boquerón, Sapuyes and Porvenir section

Reference: 190109-VS

Customer: Sacyr Consorcio SH
Country: Colombia
Location: Autopista Rumichaca-Pasto
Year: 2019

Description:

RC800 series bridge cantilever formwork adaptable to different configurations, as well as to the Colombian geometric needs of highways and roads. Capacity of 800 Tm and maximum advance of 5 meters.

Bridge cantilever formwork Boquerón, Sapuyes and Porvenir section

Reference: 190109-VS

Customer: Sacyr Consorcio SH
Country: Colombia
Location: Autopista Rumichaca-Pasto
Year: 2019

Description:

RC800 series bridge cantilever formwork adaptable to different configurations, as well as to the Colombian geometric needs of highways and roads. Capacity of 800 Tm and maximum advance of 5 meters.

SEE WHAT ELSE WE’VE BEEN DOING


Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles.