Traveling shutters formwork Urdinbide

 



Traveling shutters formwork Urdinbide


Rúbrica Tunnels

Customer: UTE Autzagane
Country: España
Location: Amorebieta (Vizcaya)
Year: 2014

Description:

The Autzagane Bypass has a total length of 3.6 kilometers between Amorebieta-Etxano and Muxika. It begins at the connection of the AP-8 with the N-634 in Amorebieta and is supported by the existing road, BI-635, for 1.5 kilometers. From there, it leaves the current road to eliminate the passage through Alto de Autzagane through the twin-tube Urdinbide tunnel, 703 meters long.

IDENTIFIED NEEDS:
One self-supporting telescopic formwork for lining the tunnel in mine and sidings. One self-supporting formwork for tunnel lining in mine. One formwork for the execution of the first phase of the tunnel lining (15 + 15 m.). One niche formwork. One gallery formwork and one junction formwork

Traveling shutters formwork Urdinbide


Rúbrica Tunnels

Customer: UTE Autzagane
Country: España
Location: Amorebieta (Vizcaya)
Year: 2014

Description:

The Autzagane Bypass has a total length of 3.6 kilometers between Amorebieta-Etxano and Muxika. It begins at the connection of the AP-8 with the N-634 in Amorebieta and is supported by the existing road, BI-635, for 1.5 kilometers. From there, it leaves the current road to eliminate the passage through Alto de Autzagane through the twin-tube Urdinbide tunnel, 703 meters long.

IDENTIFIED NEEDS:
One self-supporting telescopic formwork for lining the tunnel in mine and sidings. One self-supporting formwork for tunnel lining in mine. One formwork for the execution of the first phase of the tunnel lining (15 + 15 m.). One niche formwork. One gallery formwork and one junction formwork