Maritime formworks `Dolphin Moorings´ for Botafoc Marina

 



Maritime formworks `Dolphin Moorings´ for Botafoc Marina

Customer: Copcisa
Country: Spain
Location: Ibiza
Year: 2016

Description:

To extend the "Transversal 2 Quay”, Botafoc Marina, Ibiza, three dolphin moorings provide a 375 m length of berthing on the south side and 328 m on the north side. The formwork system used comprises a series of supports on brackets welded to the steel sleeves of the piles on which the formwork structures are positioned. Base panels and vertical end panels.

Maritime formworks `Dolphin Moorings´ for Botafoc Marina

Customer: Copcisa
Country: Spain
Location: Ibiza
Year: 2016

Description:

To extend the "Transversal 2 Quay”, Botafoc Marina, Ibiza, three dolphin moorings provide a 375 m length of berthing on the south side and 328 m on the north side. The formwork system used comprises a series of supports on brackets welded to the steel sleeves of the piles on which the formwork structures are positioned. Base panels and vertical end panels.

SEE WHAT ELSE WE’VE BEEN DOING