Maritime formworks `Dolphin Moorings´ for Botafoc Marina
Customer: Copcisa
Country: Spain
Location: Ibiza
Year: 2016
Description:
To extend the "Transversal 2 Quay”, Botafoc Marina, Ibiza, three dolphin moorings provide a 375 m length of berthing on the south side and 328 m on the north side. The formwork system used comprises a series of supports on brackets welded to the steel sleeves of the piles on which the formwork structures are positioned. Base panels and vertical end panels.
Maritime formworks `Dolphin Moorings´ for Botafoc Marina
Customer: Copcisa
Country: Spain
Location: Ibiza
Year: 2016
Description:
To extend the "Transversal 2 Quay”, Botafoc Marina, Ibiza, three dolphin moorings provide a 375 m length of berthing on the south side and 328 m on the north side. The formwork system used comprises a series of supports on brackets welded to the steel sleeves of the piles on which the formwork structures are positioned. Base panels and vertical end panels.