Tunnel formwork for Uribarri

 



Tunnel formwork for Uribarri

Customer: UTE Metro Uribarri (Ferrovial, Amenabar, Exbasa
Country: SPAIN
Location: Bilbao
Year: 2012

Description:

Equipment made up by 1 formwork and 1 formwork carrying cart, R1 = 4.16 m, R2 = 8.40 m, 7.5 m progression.
Construction project of the tunnel of line 3 of the metropolitan railway from Bilbao (Bizkaia) Uribarri section, 950 m long.

Tunnel formwork for Uribarri

Customer: UTE Metro Uribarri (Ferrovial, Amenabar, Exbasa
Country: SPAIN
Location: Bilbao
Year: 2012

Description:

Equipment made up by 1 formwork and 1 formwork carrying cart, R1 = 4.16 m, R2 = 8.40 m, 7.5 m progression.
Construction project of the tunnel of line 3 of the metropolitan railway from Bilbao (Bizkaia) Uribarri section, 950 m long.

SEE WHAT ELSE WE’VE BEEN DOING