Tunnel form equipment Prado – Porto

 



Tunnel form equipment Prado – Porto

Customer: UTE Prado-Porto (Vías, Torrescamara, Vimac)
Country: España
Location: Vilar de Barrio (Orense)
Year: 2015

Description:

Construction project for the new HSR called the North-Northwest Corridor. Built by the Ministry of Development through Adif Madrid-Galicia HSR. Puebla de Sanabria-Lubián-Ourense section. Prado-Porto sub-section, single high-speed international gauge track with maximum speeds of 350 km / h. Right track (9.1km.) And left track 1.6 km

IDENTIFIED NEEDS:
Self-supporting equipment consisting of 2 formwork and 2 transfer travelers, R = 4.38 / 8.81m, advance 15 m. and 1 formwork for the execution of the first phase of the tunnel lining

Tunnel form equipment Prado – Porto

Customer: UTE Prado-Porto (Vías, Torrescamara, Vimac)
Country: España
Location: Vilar de Barrio (Orense)
Year: 2015

Description:

Construction project for the new HSR called the North-Northwest Corridor. Built by the Ministry of Development through Adif Madrid-Galicia HSR. Puebla de Sanabria-Lubián-Ourense section. Prado-Porto sub-section, single high-speed international gauge track with maximum speeds of 350 km / h. Right track (9.1km.) And left track 1.6 km

IDENTIFIED NEEDS:
Self-supporting equipment consisting of 2 formwork and 2 transfer travelers, R = 4.38 / 8.81m, advance 15 m. and 1 formwork for the execution of the first phase of the tunnel lining

SEE WHAT ELSE WE’VE BEEN DOING


Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles.