Tunnel form equipment Prado – Porto
Client: UTE Prado-Porto (Vías, Torrescamara, Vimac)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015
La description:
Construction project for the new HSR called the North-Northwest Corridor. Built by the Ministry of Development through Adif Madrid-Galicia HSR. Puebla de Sanabria-Lubián-Ourense section. Prado-Porto sub-section, single high-speed international gauge track with maximum speeds of 350 km / h. Right track (9.1km.) And left track 1.6 km
BESOINS IDENTIFIÉS:
Tunnel form equipment Prado – Porto
Client: UTE Prado-Porto (Vías, Torrescamara, Vimac)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015
La description:
Construction project for the new HSR called the North-Northwest Corridor. Built by the Ministry of Development through Adif Madrid-Galicia HSR. Puebla de Sanabria-Lubián-Ourense section. Prado-Porto sub-section, single high-speed international gauge track with maximum speeds of 350 km / h. Right track (9.1km.) And left track 1.6 km
BESOINS IDENTIFIÉS:
VOIR CE QUE NOUS AVONS FAIT D’AUTRE
-
France
-
Philippines
-
Scotland