Tunnel formwork for Uribarri

 



Tunnel formwork for Uribarri

Customer: UTE Metro Uribarri (Ferrovial, Amenabar, Exbasa
Country: SPAIN
Location: Bilbao
Year: 2012

Description:

Equipment made up by 1 formwork and 1 formwork carrying cart, R1 = 4.16 m, R2 = 8.40 m, 7.5 m progression.
Construction project of the tunnel of line 3 of the metropolitan railway from Bilbao (Bizkaia) Uribarri section, 950 m long.

Tunnel formwork for Uribarri

Customer: UTE Metro Uribarri (Ferrovial, Amenabar, Exbasa
Country: SPAIN
Location: Bilbao
Year: 2012

Description:

Equipment made up by 1 formwork and 1 formwork carrying cart, R1 = 4.16 m, R2 = 8.40 m, 7.5 m progression.
Construction project of the tunnel of line 3 of the metropolitan railway from Bilbao (Bizkaia) Uribarri section, 950 m long.

SEE WHAT ELSE WE’VE BEEN DOING


Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team understand which sections of the website you find most interesting and useful.