LEGUTIANO 2 TUNNEL

 



LEGUTIANO 2 TUNNEL

Customer: Hergón Metropolitan
Country: SPAIN
Location: Legutiano
Year: 2012 to 2013

Description:

Equipment made up by 2 formwork and 2 formwork-carrying carts, R1 = 4.58 m and R2 = 7.75 m, progression 15 m.
Albertia tunnel construction project, for the Bilbo-Donostia high speed line. Section Eskoriatza-Legutiano (Araba), Subsection II. Two 2100 m long tubes.

LEGUTIANO 2 TUNNEL

Customer: Hergón Metropolitan
Country: SPAIN
Location: Legutiano
Year: 2012 to 2013

Description:

Equipment made up by 2 formwork and 2 formwork-carrying carts, R1 = 4.58 m and R2 = 7.75 m, progression 15 m.
Albertia tunnel construction project, for the Bilbo-Donostia high speed line. Section Eskoriatza-Legutiano (Araba), Subsection II. Two 2100 m long tubes.

SEE WHAT ELSE WE’VE BEEN DOING


Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team understand which sections of the website you find most interesting and useful.