New tunnel in Hong Kong

New tunnel in Hong Kong

Rubrica engineering has designed and manufactured a formwork for the construction of a curved slab inside the Princess Hill Tunnel in Hong Kong. The formwork panels have dimensions of 13.00 mts x 12.00 mts and a variable height of 6.00 mts to 7.30 mts. (approx.) The...

KENNEDY TUNNEL MADE TO 70%

"Nearly a year ahead of schedule, the Kennedy tunnel will be inaugurated, a work that will unite the Perez Zujovic bridge sector with Américo Vespucio in Las Condes. The bridge is part of the Santiago Centro-Oriente Plan that builds the...

GEREDIAGA TUNNEL

GEREDIAGA TUNNEL

Client: UTE Autovía Gerediaga – Elorrio Place: Albadiño (Bizkaia) Status: In cut-and-cover tunnel phase (25% of the work) Estimated conclusion time: 2015 Project Coordinator: David Tichell Identified needs: This is a formwork for the lining both of the bored tunnel...