STATUS KENNEDY TUNNEL (SANTIAGO DE CHILE)

Dec 1, 2016 | Rubrica Tunnel

We are in the assembly stage Formwork Tunnel, here you are the latest images from our Production Manager.

Rúbrica engineering always is on the work with our engineers in the assembly stage.