Self-launching formwork tunnel equipment La Canda

 



Self-launching formwork tunnel equipment La Canda

Client: UTE TÚNEL DE LA CANDA (Comsa, Anchelergues)
Country: España
Emplacement: La Canda-Vilavella (Ourense)
année : 2013

La description:

Construction project called North-Northwest High Speed Corridor of High speed railway (HSR)
HSR Line Madrid-Galicia.
Lubyan-Ourense section.
Tunnel sub-section of La Canda-Vilavella.
The sub-section of 3.7 km. in length, it runs through the municipality of A Mezquieta, in the province of Orense. Each tunnel has a length of 869 m, of which two sections of 78 and 69 m they adopt the morphology of artificial tunnel in each of the portals, while the rest (722 m) have been excavated.

BESOINS IDENTIFIÉS:
Self-launching equipment consisting of 1 formwork for tunnel lining in mine and cut and cover tunnel and 1 translation form traveler, 4.58m / 7.78m, 15m advance. Formwork for execution of the 1st phase of the tunnel lining (30 + 30m. Linear)

Self-launching formwork tunnel equipment La Canda

Client: UTE TÚNEL DE LA CANDA (Comsa, Anchelergues)
Country: España
Emplacement: La Canda-Vilavella (Ourense)
année : 2013

La description:

Construction project called North-Northwest High Speed Corridor of High speed railway (HSR)
HSR Line Madrid-Galicia.
Lubyan-Ourense section.
Tunnel sub-section of La Canda-Vilavella.
The sub-section of 3.7 km. in length, it runs through the municipality of A Mezquieta, in the province of Orense. Each tunnel has a length of 869 m, of which two sections of 78 and 69 m they adopt the morphology of artificial tunnel in each of the portals, while the rest (722 m) have been excavated.

BESOINS IDENTIFIÉS:
Self-launching equipment consisting of 1 formwork for tunnel lining in mine and cut and cover tunnel and 1 translation form traveler, 4.58m / 7.78m, 15m advance. Formwork for execution of the 1st phase of the tunnel lining (30 + 30m. Linear)

VOIR CE QUE NOUS AVONS FAIT D’AUTRE