Mulatos mine tunnel formwork

 



Mulatos mine tunnel formwork

Client: Estyma
Country: Colombia
Emplacement: La Pintada, Antioquia
année : 2018

La description:

The Mulatos tunnel is an essential part of the Enlace Pacífico 2 road project, whose route covers 96.5 km between La Pintada - Primavera (Caldas) and La Pintada -Bolombolo (Venice), promises to unite Medellín with the Eje Cafetero and with the Pacific Coast.
It is 2.5 kilometers long and has two tubes (the right, 2,413 meters, and the left, 2,443 meters).
With these works, the travel time between Cali and Medellín for a five-axle truck will be reduced from 15 to 8 hours and a private vehicle will be able to make the journey in five hours.

BESOINS IDENTIFIÉS:
The supplied formwork is designed from the ground up so that it can be combined with existing pieces from other customer-owned formwork. With this adaptability of new and used material, a reduction in the final costs of the project is achieved.

Quel était le défi?:
The formwork allows its length to be varied by laying to achieve higher yields in straight sections and better finishes in curved sections, being able to transform between lengths of 15m, 9m and 6m according to the needs of each section of work. In addition, with the 9 and 6m modulations it is possible to work together by alternate layers or bumps, so that productivity is not reduced, even though the layers are shorter.

Mulatos mine tunnel formwork

Client: Estyma
Country: Colombia
Emplacement: La Pintada, Antioquia
année : 2018

La description:

The Mulatos tunnel is an essential part of the Enlace Pacífico 2 road project, whose route covers 96.5 km between La Pintada - Primavera (Caldas) and La Pintada -Bolombolo (Venice), promises to unite Medellín with the Eje Cafetero and with the Pacific Coast.
It is 2.5 kilometers long and has two tubes (the right, 2,413 meters, and the left, 2,443 meters).
With these works, the travel time between Cali and Medellín for a five-axle truck will be reduced from 15 to 8 hours and a private vehicle will be able to make the journey in five hours.

BESOINS IDENTIFIÉS:
The supplied formwork is designed from the ground up so that it can be combined with existing pieces from other customer-owned formwork. With this adaptability of new and used material, a reduction in the final costs of the project is achieved.

VOIR CE QUE NOUS AVONS FAIT D’AUTRE