Wings formwork travellers for Mersey Gateway Bridge

  Rúbrica Puentes

PROYECTO ESPECIAL
Cliente: Merseylink

UK

Ubicación: Widnes, (Liverpool)
Año: 2015 to 2017
HECHOS CLAVE:
Cycle obtained, internal form operation & weight restriction
¿CUÁL FUE EL RETO ?:
Avoid the use of scaffold and the lowering of FT on each movement and internal form adaptability to the different cross sections.

Descripción:

Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.

Publicaciones científicas:
ACHE 2017 congress