Carros de encofrado especiales para el Puente de Mersey

 



Carros de encofrado especiales para el Puente de Mersey


Rúbrica Puentes

Cliente: Merseylink
País: UK
Ubicación: Halton, North West England
Año: 2015 to 2017

Descripción:

6 no. R-1900 series form travellers and 2 no. Wing Travellers for the approaches for the construction of a cable stay bridge

NECESIDADES IDENTIFICADAS:

Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.

¿CUÁL FUE EL RETO ?:

Avoid the use of sacffold, avoid the lowering of FT on each movement and internal form adaptability to the different cross sections.

QUÉ MÁS HEMOS ESTADO HACIENDO