Form traveller first lifting has been completed in the Panama Atlantic Bridge. Hoisting structure assembled on pier table P23 and frontal part of form traveller 3 lifted.
Form traveller first lifting has been completed in the Panama Atlantic Bridge. Hoisting structure assembled on pier table P23 and frontal part of form traveller 3 lifted.