LIFTING THE FORM TRAVELLER AT THE SOUTH PYLON

May 18, 2016 | Rubrica Bridge

“Watch our construction teams use a hydraulic system to lift the two 270-tonne form travellers at the south pylon”

Thanks MerseyLink for editing this fantastic video.