We are in the second stage of construction Container Terminal in Moin Port, Costa Rica.
Rubrica Engineering has delivered forty cast X-Bloc of 4,5 m3
Fabrication date: 2015

We are in the second stage of construction Container Terminal in Moin Port, Costa Rica.
Rubrica Engineering has delivered forty cast X-Bloc of 4,5 m3
Fabrication date: 2015