Self-launching formwork tunnel equipment La Canda

 



Self-launching formwork tunnel equipment La Canda

Client: UTE TÚNEL DE LA CANDA (Comsa, Anchelergues)
Country: España
Emplacement: La Canda-Vilavella (Ourense)
année : 2013

La description:

Construction project called North-Northwest High Speed Corridor of High speed railway (HSR)
HSR Line Madrid-Galicia.
Lubyan-Ourense section.
Tunnel sub-section of La Canda-Vilavella.
The sub-section of 3.7 km. in length, it runs through the municipality of A Mezquieta, in the province of Orense. Each tunnel has a length of 869 m, of which two sections of 78 and 69 m they adopt the morphology of artificial tunnel in each of the portals, while the rest (722 m) have been excavated.

BESOINS IDENTIFIÉS:
Self-launching equipment consisting of 1 formwork for tunnel lining in mine and cut and cover tunnel and 1 translation form traveler, 4.58m / 7.78m, 15m advance. Formwork for execution of the 1st phase of the tunnel lining (30 + 30m. Linear)

Quel était le défi?:
The horizontal load produced during casting is transmitted from the conical prop system fixed in the panels to a continuous concrete gutter, previously executed, by means of an anchor mooring system. Advantage: with the continuous gutter no previous drills are necessary and allows a rapid advance in the execution of the previous footings; no special tools are necessary; recoverable items.

Self-launching formwork tunnel equipment La Canda

Client: UTE TÚNEL DE LA CANDA (Comsa, Anchelergues)
Country: España
Emplacement: La Canda-Vilavella (Ourense)
année : 2013

La description:

Construction project called North-Northwest High Speed Corridor of High speed railway (HSR)
HSR Line Madrid-Galicia.
Lubyan-Ourense section.
Tunnel sub-section of La Canda-Vilavella.
The sub-section of 3.7 km. in length, it runs through the municipality of A Mezquieta, in the province of Orense. Each tunnel has a length of 869 m, of which two sections of 78 and 69 m they adopt the morphology of artificial tunnel in each of the portals, while the rest (722 m) have been excavated.

BESOINS IDENTIFIÉS:
Self-launching equipment consisting of 1 formwork for tunnel lining in mine and cut and cover tunnel and 1 translation form traveler, 4.58m / 7.78m, 15m advance. Formwork for execution of the 1st phase of the tunnel lining (30 + 30m. Linear)

VOIR CE QUE NOUS AVONS FAIT D’AUTRE


Résumé de la politique de confidentialité

Ce site utilise des cookies afin que nous puissions vous fournir la meilleure expérience utilisateur possible. Les informations sur les cookies sont stockées dans votre navigateur et remplissent des fonctions telles que vous reconnaître lorsque vous revenez sur notre site Web et aider notre équipe à comprendre les sections du site que vous trouvez les plus intéressantes et utiles.