Tunnel form equipment Prado – Porto

 



Tunnel form equipment Prado – Porto

Client: UTE Prado-Porto (Vías, Torrescamara, Vimac)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015

La description:

Construction project for the new HSR called the North-Northwest Corridor. Built by the Ministry of Development through Adif Madrid-Galicia HSR. Puebla de Sanabria-Lubián-Ourense section. Prado-Porto sub-section, single high-speed international gauge track with maximum speeds of 350 km / h. Right track (9.1km.) And left track 1.6 km

BESOINS IDENTIFIÉS:
Self-supporting equipment consisting of 2 formwork and 2 transfer travelers, R = 4.38 / 8.81m, advance 15 m. and 1 formwork for the execution of the first phase of the tunnel lining

Tunnel form equipment Prado – Porto

Client: UTE Prado-Porto (Vías, Torrescamara, Vimac)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015

La description:

Construction project for the new HSR called the North-Northwest Corridor. Built by the Ministry of Development through Adif Madrid-Galicia HSR. Puebla de Sanabria-Lubián-Ourense section. Prado-Porto sub-section, single high-speed international gauge track with maximum speeds of 350 km / h. Right track (9.1km.) And left track 1.6 km

BESOINS IDENTIFIÉS:
Self-supporting equipment consisting of 2 formwork and 2 transfer travelers, R = 4.38 / 8.81m, advance 15 m. and 1 formwork for the execution of the first phase of the tunnel lining

VOIR CE QUE NOUS AVONS FAIT D’AUTRE


Résumé de la politique de confidentialité

Ce site utilise des cookies afin que nous puissions vous fournir la meilleure expérience utilisateur possible. Les informations sur les cookies sont stockées dans votre navigateur et remplissent des fonctions telles que vous reconnaître lorsque vous revenez sur notre site Web et aider notre équipe à comprendre les sections du site que vous trouvez les plus intéressantes et utiles.