Tunneling solution Túnel Prado

 



Tunneling solution Túnel Prado

Client: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015

La description:

Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)

BESOINS IDENTIFIÉS:
Self-supporting equipment composed of 4 formwork and 2 transfer cars, R = 4.37 / 8.81m, advance 15m. and formwork for the execution of the 1st phase of the tunnel lining, (30 + 30m.)

Tunneling solution Túnel Prado

Client: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015

La description:

Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)

BESOINS IDENTIFIÉS:
Self-supporting equipment composed of 4 formwork and 2 transfer cars, R = 4.37 / 8.81m, advance 15m. and formwork for the execution of the 1st phase of the tunnel lining, (30 + 30m.)

VOIR CE QUE NOUS AVONS FAIT D’AUTRE


Résumé de la politique de confidentialité

Ce site utilise des cookies afin que nous puissions vous fournir la meilleure expérience utilisateur possible. Les informations sur les cookies sont stockées dans votre navigateur et remplissent des fonctions telles que vous reconnaître lorsque vous revenez sur notre site Web et aider notre équipe à comprendre les sections du site que vous trouvez les plus intéressantes et utiles.