Tunnel formwork for Legutiano 2 galleries
Client: Hergon Metropolitan
Country: España
Emplacement: Legutiano
année : 2012
La description:
Construction project of the Albertia tunnel, Bilbao-Donostia HSR. Legutiano Section (Álava) - Eskoriatza (Guipúzcoa), Subsection II.The new HSR will allow the interconnection of the three Basque capitals. Travel times between Vitoria-Gasteiz and Bilbao will be 28 minutes; between Vitoria-Gasteiz and San Sebastián, 34 minutes; and 38 minutes between Bilbao and San Sebastián.The HSR is part of Priority Project No. 3 of the European Atlantic Railway Axis, giving continuity in Spanish territory to the Madrid-Valladolid-Vitoria / Gasteiz line, extending it to the French border.
BESOINS IDENTIFIÉS:
Tunnel formwork for Legutiano 2 galleries
Client: Hergon Metropolitan
Country: España
Emplacement: Legutiano
année : 2012
La description:
Construction project of the Albertia tunnel, Bilbao-Donostia HSR. Legutiano Section (Álava) - Eskoriatza (Guipúzcoa), Subsection II.The new HSR will allow the interconnection of the three Basque capitals. Travel times between Vitoria-Gasteiz and Bilbao will be 28 minutes; between Vitoria-Gasteiz and San Sebastián, 34 minutes; and 38 minutes between Bilbao and San Sebastián.The HSR is part of Priority Project No. 3 of the European Atlantic Railway Axis, giving continuity in Spanish territory to the Madrid-Valladolid-Vitoria / Gasteiz line, extending it to the French border.
BESOINS IDENTIFIÉS:
VOIR CE QUE NOUS AVONS FAIT D’AUTRE
-
France
-
Philippines
-
Scotland