Tunneling solution Túnel Prado
Client: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015
La description:
Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)
BESOINS IDENTIFIÉS:
Tunneling solution Túnel Prado
Client: UTE TÚNEL PRADO (Dragados, Tecsa)
Country: España
Emplacement: Vilar de Barrio (Orense)
année : 2015
La description:
Construction project for the new HSR network called the North-Northwest Corridor. Built by the Ministry of Development through Adif.Madrid-Galicia high-speed line. Puebla de Sanabria-Lubián-Ourense section. Prado sub-section, single high-speed international gauge track. Left track (7.6km.)
BESOINS IDENTIFIÉS: