Formwork for precast blocks Accropode II
Référence: 201104-BL
Client: Strabag
Country: Rumania
Emplacement: Port of Constanza
année : 2020
La description:
The Accropode II steel mold for a 1 m3 unit, following the CLI (Concrete Layer Innovations) standards, consists of two halves, each half has a stripping spindle and a window for inspection and vibration.
To facilitate the unmoulding and replacement operation, both halves of the mold are closed and have swivel and height-adjustable scaffolding wheels.
The two halves are joined with DSI chainring bars and nuts.
BESOINS IDENTIFIÉS:
Quel était le défi?:
Formwork for precast blocks Accropode II
Référence: 201104-BL
Client: Strabag
Country: Rumania
Emplacement: Port of Constanza
année : 2020
La description:
The Accropode II steel mold for a 1 m3 unit, following the CLI (Concrete Layer Innovations) standards, consists of two halves, each half has a stripping spindle and a window for inspection and vibration.
To facilitate the unmoulding and replacement operation, both halves of the mold are closed and have swivel and height-adjustable scaffolding wheels.
The two halves are joined with DSI chainring bars and nuts.
BESOINS IDENTIFIÉS:
Quel était le défi?:
VOIR CE QUE NOUS AVONS FAIT D’AUTRE
-
France
-
Philippines
-
Scotland