Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)

 



Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)

Référence: 200112-VS

Client: ACROW FORMWORK TECHNOLOGY
Country: Tanzania
Emplacement: Julius Nyre Hidropower Station Compound
année : 2020-22

La description:

RC800 standard successive cantilever project. Very heavy and robust bridge 50m above the ground intended to transport materials for the construction of the dam of the adjacent hydroelectric station

Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)

Référence: 200112-VS

Client: ACROW FORMWORK TECHNOLOGY
Country: Tanzania
Emplacement: Julius Nyre Hidropower Station Compound
année : 2020-22

La description:

RC800 standard successive cantilever project. Very heavy and robust bridge 50m above the ground intended to transport materials for the construction of the dam of the adjacent hydroelectric station

VOIR CE QUE NOUS AVONS FAIT D’AUTRE