Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)

 



Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)

Référence: 200112-VS

Client: ACROW FORMWORK TECHNOLOGY
Country: Tanzania
Emplacement: Julius Nyre Hidropower Station Compound
année : 2020-22

La description:

RC800 standard successive cantilever project. Very heavy and robust bridge 50m above the ground intended to transport materials for the construction of the dam of the adjacent hydroelectric station

Overhead form traveller Julius Nyerere Hydropower Project (JNHPP)

Référence: 200112-VS

Client: ACROW FORMWORK TECHNOLOGY
Country: Tanzania
Emplacement: Julius Nyre Hidropower Station Compound
année : 2020-22

La description:

RC800 standard successive cantilever project. Very heavy and robust bridge 50m above the ground intended to transport materials for the construction of the dam of the adjacent hydroelectric station

VOIR CE QUE NOUS AVONS FAIT D’AUTRE


Résumé de la politique de confidentialité

Ce site utilise des cookies afin que nous puissions vous fournir la meilleure expérience utilisateur possible. Les informations sur les cookies sont stockées dans votre navigateur et remplissent des fonctions telles que vous reconnaître lorsque vous revenez sur notre site Web et aider notre équipe à comprendre les sections du site que vous trouvez les plus intéressantes et utiles.