Form traveller first lifting has been completed in the Panama Atlantic Bridge. Hoisting structure assembled on pier table P23 and frontal part of form traveller 3 lifted.
OUR WT (WING TRAVELLER) AND FT (FORMWORK TRAVELLER) LOOKING FORWARD CLOSING
The WT (Wing Traveller) in their last segment, and FT (Formwork Traveller) looking forward closing north side span. Both of them has been designed and produced by RUBRICA BRIDGES
VIDEO MERSEY GATEWAY BRIDGE
Bridge Construction Status: 6 no Form Travellers and 2 no Wing Travellers for the approaches for the construction of a cable stay bridge
INTERNAL PREASSEMBLY FORMWORK TRAVELLER ATLANTIC BRIDGE (PANAMÁ)
For the specials projects, we use a tool to simulate the concrete layout. Enjoy with this funny time-lapse about the inner formwork preassembly: launching and panels folding.
(STATUS ATLANTIC BRIDGE (PANAMÁ)
Rúbrica Engineering with its formwork travellers is now in the frontal part assembly in the pile cap. Here you can watch a short video about status Atlantic Bridge Panamá
STATUS ATLANTIC BRIDGE (PANAMA)
Rúbrica Engineering with its formwork travellers is now in the frontal part assembly in the pile cap.
ARTICLE BRIDGE MAGAZINE
Here you are the fantastic article Bridge Magazine writes for our Project Manager Javier Fernández del Moral.
STATUS VIADUCT OVER TAJO RIVER
We just update the project "viaduct over Tajo river" with new pictures. Our pair of tri-hinged travellers go away quickly, and we expect finish in next dates. Arch with variable cross-section of 324 m free span between supports is another Rúbrica WR (World...
VISIT MERSEY BRIDGE WORK
Last week Rubrica managers and partners visited the Mersey Bridge work. It was a nice day, here you can see the video walking to the travellers...