{"id":13914,"date":"2022-06-07T14:07:14","date_gmt":"2022-06-07T12:07:14","guid":{"rendered":"https:\/\/rubricaingenieria.com\/?p=13914"},"modified":"2022-06-07T14:56:40","modified_gmt":"2022-06-07T12:56:40","slug":"first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel","status":"publish","type":"post","link":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/","title":{"rendered":"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel"},"content":{"rendered":"<p>(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel)<br \/>\nThe Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the V\u00edas Mar 1 and Mar 21 located to the west of Antioquia. This seeks to connect the cities and production centers in the interior of the country with the sea of \u200b\u200bUrab\u00e1 and the ports that are being built in this region. At the end of the construction of the main tunnel, it would be the longest in the American continent, surpassing the T\u00fanel de la L\u00ednea (8,580 m) and the T\u00fanel de Oriente (8,200 m), also located in Colombia.<br \/>\nThe Guillermo Gaviria Echeverri Tunnel Megaproject and its access roads are part of the Prosperity Highways executed by the National Government through its fourth generation 4G road concession program.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-13916\" src=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/imagenes-longitudes-web-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1440\" srcset=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/imagenes-longitudes-web-scaled.jpg 2560w, https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/imagenes-longitudes-web-1280x720.jpg 1280w, https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/imagenes-longitudes-web-980x551.jpg 980w, https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/imagenes-longitudes-web-480x270.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 2560px, 100vw\" \/><br \/>\nThe purpose of the project is to improve the connectivity conditions of Medell\u00edn with Urab\u00e1 Antioquia and in general of the department of Antioquia with the center of the country, the Pacific and Atlantic Coasts, also managing to optimize transportation and facilitate foreign trade, as well as flows of products and merchandise destined for the national market.<\/p>\n<p style=\"text-align: left;\"><strong>We leave you some images of our tunnel formwork working, thanks our partner in Colombia, Rubster<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-13925\" src=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/IMG-20220531-WA0012-768x1024.jpg\" alt=\"Guillermo Gaviria Echeverri Tunnel by R\u00daBRICA TUNNELS\" width=\"768\" height=\"1024\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Thank you<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-13919\" src=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/Imagen5-300x100.png\" alt=\"\" width=\"300\" height=\"100\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel) The Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the V\u00edas Mar 1 and Mar 21 located to the west of Antioquia. This seeks to connect [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":13922,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[89,45],"tags":[504],"class_list":["post-13914","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticia-destacada","category-rubrica-tunnel-n","tag-guillermo-gaviria-echeverri-tunnel"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel - Rubrica Ingenieria<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel - Rubrica Ingenieria\" \/>\n<meta property=\"og:description\" content=\"(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel) The Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the V\u00edas Mar 1 and Mar 21 located to the west of Antioquia. This seeks to connect [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/\" \/>\n<meta property=\"og:site_name\" content=\"Rubrica Ingenieria\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-07T12:07:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-07T12:56:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/IMG-20220531-WA0011.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"1599\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Pablo Urbea\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pablo Urbea\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/\"},\"author\":{\"name\":\"Pablo Urbea\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#\\\/schema\\\/person\\\/11264a6b9722591dbe8a6baf4214ed65\"},\"headline\":\"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel\",\"datePublished\":\"2022-06-07T12:07:14+00:00\",\"dateModified\":\"2022-06-07T12:56:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/\"},\"wordCount\":237,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/IMG-20220531-WA0011.jpg\",\"keywords\":[\"Guillermo Gaviria Echeverri tunnel\"],\"articleSection\":[\"News Highlights\",\"Rubrica Tunnel\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/\",\"name\":\"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel - Rubrica Ingenieria\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/IMG-20220531-WA0011.jpg\",\"datePublished\":\"2022-06-07T12:07:14+00:00\",\"dateModified\":\"2022-06-07T12:56:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/IMG-20220531-WA0011.jpg\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/IMG-20220531-WA0011.jpg\",\"width\":1200,\"height\":1599,\"caption\":\"Guillermo Gaviria Echeverri Tunnel by R\u00daBRICA TUNNELS\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/\",\"name\":\"R\u00fabrica Engineering\",\"description\":\"Soluciones de ingenieria inteligente\",\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#organization\",\"name\":\"R\u00fabrica Engineering\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"width\":864,\"height\":173,\"caption\":\"R\u00fabrica Engineering\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rubricaengineering\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/#\\\/schema\\\/person\\\/11264a6b9722591dbe8a6baf4214ed65\",\"name\":\"Pablo Urbea\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g\",\"caption\":\"Pablo Urbea\"},\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/fr\\\/author\\\/purbea\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel - Rubrica Ingenieria","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/","og_locale":"fr_FR","og_type":"article","og_title":"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel - Rubrica Ingenieria","og_description":"(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel) The Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the V\u00edas Mar 1 and Mar 21 located to the west of Antioquia. This seeks to connect [&hellip;]","og_url":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/","og_site_name":"Rubrica Ingenieria","article_published_time":"2022-06-07T12:07:14+00:00","article_modified_time":"2022-06-07T12:56:40+00:00","og_image":[{"width":1200,"height":1599,"url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/IMG-20220531-WA0011.jpg","type":"image\/jpeg"}],"author":"Pablo Urbea","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Pablo Urbea","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#article","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/"},"author":{"name":"Pablo Urbea","@id":"https:\/\/rubricaingenieria.com\/fr\/#\/schema\/person\/11264a6b9722591dbe8a6baf4214ed65"},"headline":"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel","datePublished":"2022-06-07T12:07:14+00:00","dateModified":"2022-06-07T12:56:40+00:00","mainEntityOfPage":{"@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/"},"wordCount":237,"commentCount":0,"publisher":{"@id":"https:\/\/rubricaingenieria.com\/fr\/#organization"},"image":{"@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/IMG-20220531-WA0011.jpg","keywords":["Guillermo Gaviria Echeverri tunnel"],"articleSection":["News Highlights","Rubrica Tunnel"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/","url":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/","name":"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel - Rubrica Ingenieria","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#primaryimage"},"image":{"@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/IMG-20220531-WA0011.jpg","datePublished":"2022-06-07T12:07:14+00:00","dateModified":"2022-06-07T12:56:40+00:00","breadcrumb":{"@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#primaryimage","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/IMG-20220531-WA0011.jpg","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2022\/06\/IMG-20220531-WA0011.jpg","width":1200,"height":1599,"caption":"Guillermo Gaviria Echeverri Tunnel by R\u00daBRICA TUNNELS"},{"@type":"BreadcrumbList","@id":"https:\/\/rubricaingenieria.com\/fr\/first-steps-of-our-formwork-equipment-for-the-guillermo-gaviria-echeverri-tunnel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/rubricaingenieria.com\/fr\/"},{"@type":"ListItem","position":2,"name":"First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel"}]},{"@type":"WebSite","@id":"https:\/\/rubricaingenieria.com\/fr\/#website","url":"https:\/\/rubricaingenieria.com\/fr\/","name":"R\u00fabrica Engineering","description":"Soluciones de ingenieria inteligente","publisher":{"@id":"https:\/\/rubricaingenieria.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rubricaingenieria.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/rubricaingenieria.com\/fr\/#organization","name":"R\u00fabrica Engineering","url":"https:\/\/rubricaingenieria.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/rubricaingenieria.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","width":864,"height":173,"caption":"R\u00fabrica Engineering"},"image":{"@id":"https:\/\/rubricaingenieria.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rubricaengineering"]},{"@type":"Person","@id":"https:\/\/rubricaingenieria.com\/fr\/#\/schema\/person\/11264a6b9722591dbe8a6baf4214ed65","name":"Pablo Urbea","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g","caption":"Pablo Urbea"},"url":"https:\/\/rubricaingenieria.com\/fr\/author\/purbea\/"}]}},"_links":{"self":[{"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/posts\/13914","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/comments?post=13914"}],"version-history":[{"count":13,"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/posts\/13914\/revisions"}],"predecessor-version":[{"id":13943,"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/posts\/13914\/revisions\/13943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/media\/13922"}],"wp:attachment":[{"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/media?parent=13914"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/categories?post=13914"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/fr\/wp-json\/wp\/v2\/tags?post=13914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}