{"id":4226,"date":"2016-01-28T07:56:02","date_gmt":"2016-01-28T07:56:02","guid":{"rendered":"http:\/\/rubricaingenieria.com\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/"},"modified":"2016-01-28T07:56:02","modified_gmt":"2016-01-28T07:56:02","slug":"montaje-de-las-maquinas-del-equipo-especial-de-encofrado","status":"publish","type":"post","link":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/","title":{"rendered":"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO"},"content":{"rendered":"<p>Gracias a Merseylink por escribir tan bien acerca de nuestro equipo especial de encofrado\u00a0y en que fase se encuentra:<\/p>\n<p>We copy the new\u00a0form Mersey Newslleter about the stage work: \u00bb\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called \u2018form travellers\u2019 are currently being assembled at the north and south cofferdams. They will act as movable concrete moulds for the bridge deck spans and work in a similar way to the MSS, which is building the elevated approach viaducts.\u00a0Three pairs of form travellers will be built in total; one pair for each bridge pylon. Once assembled, they will be lifted by a hydraulic system and fixed into place at either side of the bridge pylons.\u00a0The form travellers will then be separated and moved to the next span position, so the deck will effectively \u2018grow\u2019 from each side of the pylon until the main bridge deck is complete.\u00a0After the third deck segment has been cast from the bridge pylon, it will then be connected to a stay cable and the pylon for support.\u00a0The machines are expected to be ready to start work in the spring\u00bb.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gracias a Merseylink por escribir tan bien acerca de nuestro equipo especial de encofrado\u00a0y en que fase se encuentra: We copy the new\u00a0form Mersey Newslleter about the stage work: \u00bb\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":3903,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[125],"tags":[149],"class_list":["post-4226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rubrica-puentes-n","tag-mersey-gateway-es"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO - Rubrica Ingenieria<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO - Rubrica Ingenieria\" \/>\n<meta property=\"og:description\" content=\"Gracias a Merseylink por escribir tan bien acerca de nuestro equipo especial de encofrado\u00a0y en que fase se encuentra: We copy the new\u00a0form Mersey Newslleter about the stage work: \u00bb\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/\" \/>\n<meta property=\"og:site_name\" content=\"Rubrica Ingenieria\" \/>\n<meta property=\"article:published_time\" content=\"2016-01-28T07:56:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"905\" \/>\n\t<meta property=\"og:image:height\" content=\"435\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"adminrub\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"adminrub\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minuto\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/\"},\"author\":{\"name\":\"adminrub\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#\\\/schema\\\/person\\\/193e750075a72fd33c170626739bf8e9\"},\"headline\":\"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO\",\"datePublished\":\"2016-01-28T07:56:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/\"},\"wordCount\":217,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"keywords\":[\"Puente de Mersey\"],\"articleSection\":[\"R\u00fabrica Puentes\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/\",\"name\":\"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO - Rubrica Ingenieria\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"datePublished\":\"2016-01-28T07:56:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#primaryimage\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"width\":905,\"height\":435},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/\",\"name\":\"R\u00fabrica Engineering\",\"description\":\"Soluciones de ingenieria inteligente\",\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#organization\",\"name\":\"R\u00fabrica Engineering\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"width\":864,\"height\":173,\"caption\":\"R\u00fabrica Engineering\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rubricaengineering\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/#\\\/schema\\\/person\\\/193e750075a72fd33c170626739bf8e9\",\"name\":\"adminrub\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"caption\":\"adminrub\"},\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/es\\\/author\\\/adminrub\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO - Rubrica Ingenieria","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/","og_locale":"es_ES","og_type":"article","og_title":"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO - Rubrica Ingenieria","og_description":"Gracias a Merseylink por escribir tan bien acerca de nuestro equipo especial de encofrado\u00a0y en que fase se encuentra: We copy the new\u00a0form Mersey Newslleter about the stage work: \u00bb\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called [&hellip;]","og_url":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/","og_site_name":"Rubrica Ingenieria","article_published_time":"2016-01-28T07:56:02+00:00","og_image":[{"width":905,"height":435,"url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","type":"image\/jpeg"}],"author":"adminrub","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"adminrub","Tiempo de lectura":"1 minuto"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#article","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/"},"author":{"name":"adminrub","@id":"https:\/\/rubricaingenieria.com\/es\/#\/schema\/person\/193e750075a72fd33c170626739bf8e9"},"headline":"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO","datePublished":"2016-01-28T07:56:02+00:00","mainEntityOfPage":{"@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/"},"wordCount":217,"commentCount":0,"publisher":{"@id":"https:\/\/rubricaingenieria.com\/es\/#organization"},"image":{"@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","keywords":["Puente de Mersey"],"articleSection":["R\u00fabrica Puentes"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/","url":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/","name":"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO - Rubrica Ingenieria","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#primaryimage"},"image":{"@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","datePublished":"2016-01-28T07:56:02+00:00","breadcrumb":{"@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#primaryimage","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","width":905,"height":435},{"@type":"BreadcrumbList","@id":"https:\/\/rubricaingenieria.com\/es\/montaje-de-las-maquinas-del-equipo-especial-de-encofrado\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/rubricaingenieria.com\/es\/"},{"@type":"ListItem","position":2,"name":"MONTAJE DE LAS M\u00c1QUINAS DEL EQUIPO ESPECIAL DE ENCOFRADO"}]},{"@type":"WebSite","@id":"https:\/\/rubricaingenieria.com\/es\/#website","url":"https:\/\/rubricaingenieria.com\/es\/","name":"R\u00fabrica Engineering","description":"Soluciones de ingenieria inteligente","publisher":{"@id":"https:\/\/rubricaingenieria.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rubricaingenieria.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/rubricaingenieria.com\/es\/#organization","name":"R\u00fabrica Engineering","url":"https:\/\/rubricaingenieria.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/rubricaingenieria.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","width":864,"height":173,"caption":"R\u00fabrica Engineering"},"image":{"@id":"https:\/\/rubricaingenieria.com\/es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rubricaengineering"]},{"@type":"Person","@id":"https:\/\/rubricaingenieria.com\/es\/#\/schema\/person\/193e750075a72fd33c170626739bf8e9","name":"adminrub","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","caption":"adminrub"},"url":"https:\/\/rubricaingenieria.com\/es\/author\/adminrub\/"}]}},"_links":{"self":[{"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/posts\/4226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/comments?post=4226"}],"version-history":[{"count":0,"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/posts\/4226\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/media\/3903"}],"wp:attachment":[{"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/media?parent=4226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/categories?post=4226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/es\/wp-json\/wp\/v2\/tags?post=4226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}