{"id":2347,"date":"2016-01-28T07:56:02","date_gmt":"2016-01-28T07:56:02","guid":{"rendered":"http:\/\/rubricaingenieria.com\/?p=2347"},"modified":"2018-03-13T11:05:10","modified_gmt":"2018-03-13T11:05:10","slug":"assembly-of-form-traveller-machines","status":"publish","type":"post","link":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/","title":{"rendered":"ASSEMBLY OF &#8216;FORM TRAVELLER&#8217; MACHINES"},"content":{"rendered":"<p>Thanks Merseylink for writing so good about RUBRICA BRIDGES form traveller.<\/p>\n<p>We copy the new\u00a0form Mersey Newslleter about the stage work: &#8221;\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called \u2018form travellers\u2019 are currently being assembled at the north and south cofferdams. They will act as movable concrete moulds for the bridge deck spans and work in a similar way to the MSS, which is building the elevated approach viaducts.\u00a0Three pairs of form travellers will be built in total; one pair for each bridge pylon. Once assembled, they will be lifted by a hydraulic system and fixed into place at either side of the bridge pylons.\u00a0The form travellers will then be separated and moved to the next span position, so the deck will effectively \u2018grow\u2019 from each side of the pylon until the main bridge deck is complete.\u00a0After the third deck segment has been cast from the bridge pylon, it will then be connected to a stay cable and the pylon for support.\u00a0The machines are expected to be ready to start work in the spring&#8221;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thanks Merseylink for writing so good about RUBRICA BRIDGES form traveller. We copy the new\u00a0form Mersey Newslleter about the stage work: &#8221;\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called \u2018form travellers\u2019 are currently being assembled at the [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":2348,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[46],"tags":[97],"class_list":["post-2347","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rubrica-bridgge-n","tag-mersey-gateway"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ASSEMBLY OF &#039;FORM TRAVELLER&#039; MACHINES - R\u00fabrica Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ASSEMBLY OF &#039;FORM TRAVELLER&#039; MACHINES - R\u00fabrica Engineering\" \/>\n<meta property=\"og:description\" content=\"Thanks Merseylink for writing so good about RUBRICA BRIDGES form traveller. We copy the new\u00a0form Mersey Newslleter about the stage work: &#8221;\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called \u2018form travellers\u2019 are currently being assembled at the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/\" \/>\n<meta property=\"og:site_name\" content=\"R\u00fabrica Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2016-01-28T07:56:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-03-13T11:05:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"905\" \/>\n\t<meta property=\"og:image:height\" content=\"435\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"adminrub\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"adminrub\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/\"},\"author\":{\"name\":\"adminrub\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/person\\\/193e750075a72fd33c170626739bf8e9\"},\"headline\":\"ASSEMBLY OF &#8216;FORM TRAVELLER&#8217; MACHINES\",\"datePublished\":\"2016-01-28T07:56:02+00:00\",\"dateModified\":\"2018-03-13T11:05:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/\"},\"wordCount\":203,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"keywords\":[\"Mersey Gateway\"],\"articleSection\":[\"Rubrica Bridge\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/\",\"name\":\"ASSEMBLY OF 'FORM TRAVELLER' MACHINES - R\u00fabrica Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"datePublished\":\"2016-01-28T07:56:02+00:00\",\"dateModified\":\"2018-03-13T11:05:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#primaryimage\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2018\\\/02\\\/f95db407b1996eb7f784b2584f039794.jpg\",\"width\":905,\"height\":435},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/assembly-of-form-traveller-machines\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ASSEMBLY OF &#8216;FORM TRAVELLER&#8217; MACHINES\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\",\"name\":\"R\u00fabrica Engineering\",\"description\":\"Intelligent construction methods for civil works\",\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\",\"name\":\"R\u00fabrica Engineering\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"width\":864,\"height\":173,\"caption\":\"R\u00fabrica Engineering\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rubricaengineering\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/person\\\/193e750075a72fd33c170626739bf8e9\",\"name\":\"adminrub\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"caption\":\"adminrub\"},\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/author\\\/adminrub\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ASSEMBLY OF 'FORM TRAVELLER' MACHINES - R\u00fabrica Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/","og_locale":"en_US","og_type":"article","og_title":"ASSEMBLY OF 'FORM TRAVELLER' MACHINES - R\u00fabrica Engineering","og_description":"Thanks Merseylink for writing so good about RUBRICA BRIDGES form traveller. We copy the new\u00a0form Mersey Newslleter about the stage work: &#8221;\u00a0Construction teams have started to assemble the special machines that will build the Mersey Gateway bridge deck between the three bridge pylons.\u00a0The bright blue machines called \u2018form travellers\u2019 are currently being assembled at the [&hellip;]","og_url":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/","og_site_name":"R\u00fabrica Engineering","article_published_time":"2016-01-28T07:56:02+00:00","article_modified_time":"2018-03-13T11:05:10+00:00","og_image":[{"width":905,"height":435,"url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","type":"image\/jpeg"}],"author":"adminrub","twitter_card":"summary_large_image","twitter_misc":{"Written by":"adminrub","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#article","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/"},"author":{"name":"adminrub","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/person\/193e750075a72fd33c170626739bf8e9"},"headline":"ASSEMBLY OF &#8216;FORM TRAVELLER&#8217; MACHINES","datePublished":"2016-01-28T07:56:02+00:00","dateModified":"2018-03-13T11:05:10+00:00","mainEntityOfPage":{"@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/"},"wordCount":203,"commentCount":0,"publisher":{"@id":"https:\/\/rubricaingenieria.com\/en\/#organization"},"image":{"@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","keywords":["Mersey Gateway"],"articleSection":["Rubrica Bridge"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/","url":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/","name":"ASSEMBLY OF 'FORM TRAVELLER' MACHINES - R\u00fabrica Engineering","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#primaryimage"},"image":{"@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","datePublished":"2016-01-28T07:56:02+00:00","dateModified":"2018-03-13T11:05:10+00:00","breadcrumb":{"@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#primaryimage","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2018\/02\/f95db407b1996eb7f784b2584f039794.jpg","width":905,"height":435},{"@type":"BreadcrumbList","@id":"https:\/\/rubricaingenieria.com\/en\/assembly-of-form-traveller-machines\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/rubricaingenieria.com\/en\/"},{"@type":"ListItem","position":2,"name":"ASSEMBLY OF &#8216;FORM TRAVELLER&#8217; MACHINES"}]},{"@type":"WebSite","@id":"https:\/\/rubricaingenieria.com\/en\/#website","url":"https:\/\/rubricaingenieria.com\/en\/","name":"R\u00fabrica Engineering","description":"Intelligent construction methods for civil works","publisher":{"@id":"https:\/\/rubricaingenieria.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rubricaingenieria.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rubricaingenieria.com\/en\/#organization","name":"R\u00fabrica Engineering","url":"https:\/\/rubricaingenieria.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","width":864,"height":173,"caption":"R\u00fabrica Engineering"},"image":{"@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rubricaengineering"]},{"@type":"Person","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/person\/193e750075a72fd33c170626739bf8e9","name":"adminrub","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","caption":"adminrub"},"url":"https:\/\/rubricaingenieria.com\/en\/author\/adminrub\/"}]}},"_links":{"self":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/2347","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/comments?post=2347"}],"version-history":[{"count":0,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/2347\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/media\/2348"}],"wp:attachment":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/media?parent=2347"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/categories?post=2347"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/tags?post=2347"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}