{"id":2289,"date":"2017-04-26T23:52:11","date_gmt":"2017-04-26T23:52:11","guid":{"rendered":"http:\/\/rubricaingenieria.com\/?p=2289"},"modified":"2018-03-13T11:01:45","modified_gmt":"2018-03-13T11:01:45","slug":"kennedy-tunnel-made-to-70","status":"publish","type":"post","link":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/","title":{"rendered":"KENNEDY TUNNEL MADE TO 70%"},"content":{"rendered":"<p><iframe loading=\"lazy\" width=\"1080\" height=\"608\" src=\"https:\/\/www.youtube.com\/embed\/AZKoyB7aLA0?feature=oembed\" frameborder=\"0\" allow=\"autoplay; encrypted-media\" allowfullscreen><\/iframe><\/p>\n<p>&#8220;Nearly a year ahead of schedule, the Kennedy tunnel will be inaugurated, a work that will unite the Perez Zujovic bridge sector with Am\u00e9rico Vespucio in Las Condes. The bridge is part of the Santiago Centro-Oriente Plan that builds the concessionaire Costanera Norte and seeks to improve the vehicular flows of that sector. This was stated on Friday by the Minister of Public Works, Alberto Undurraga, who inspected the progress of the work carried out some 30 meters underground.\u00a0<strong>The minister detailed the new dates and the technology used to accelerate the construction process, which is based on the operation of a formwork traveller that operates on rails and advances about 15 meters per day. &#8220;It is a work that was initially scheduled to end at the end of 2018. We have changed the construction method with these trains that make the concrete lining, which will allow it to have it running during this year 2017,&#8221; said the MOP head<\/strong>. The new Kennedy tunnel, which has a 68% advance in works, will be extended by 1.2 kilometers in length and represents an investment of US $ 148 million. The work will increase the capacity of Kennedy Avenue by 50%, with flows of 8,500 vehicles per hour.<br \/>\nFor More:\u00a0<a href=\"https:\/\/chicureo.com\/taller\/2017\/02\/25\/mop-anuncia-que-nuevo-tunel-kennedy-sera-inaugurado-en-2017\/\" target=\"_blank\" rel=\"noopener\">MOP anuncia que nuevo t\u00fanel Kennedy ser\u00e1 inaugurado en 2017 | Chicureo.com: Cr\u00f3nica<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;Nearly a year ahead of schedule, the Kennedy tunnel will be inaugurated, a work that will unite the Perez Zujovic bridge sector with Am\u00e9rico Vespucio in Las Condes. The bridge is part of the Santiago Centro-Oriente Plan that builds the concessionaire Costanera Norte and seeks to improve the vehicular flows of that sector. This was [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"video","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[45],"tags":[100],"class_list":["post-2289","post","type-post","status-publish","format-video","hentry","category-rubrica-tunnel-n","tag-kennedy-tunnel","post_format-post-format-video"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>KENNEDY TUNNEL MADE TO 70% - R\u00fabrica Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KENNEDY TUNNEL MADE TO 70% - R\u00fabrica Engineering\" \/>\n<meta property=\"og:description\" content=\"&#8220;Nearly a year ahead of schedule, the Kennedy tunnel will be inaugurated, a work that will unite the Perez Zujovic bridge sector with Am\u00e9rico Vespucio in Las Condes. The bridge is part of the Santiago Centro-Oriente Plan that builds the concessionaire Costanera Norte and seeks to improve the vehicular flows of that sector. This was [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/\" \/>\n<meta property=\"og:site_name\" content=\"R\u00fabrica Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-26T23:52:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-03-13T11:01:45+00:00\" \/>\n<meta name=\"author\" content=\"adminrub\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"adminrub\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/\"},\"author\":{\"name\":\"adminrub\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/person\\\/193e750075a72fd33c170626739bf8e9\"},\"headline\":\"KENNEDY TUNNEL MADE TO 70%\",\"datePublished\":\"2017-04-26T23:52:11+00:00\",\"dateModified\":\"2018-03-13T11:01:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/\"},\"wordCount\":222,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\"},\"keywords\":[\"Kennedy Tunnel\"],\"articleSection\":[\"Rubrica Tunnel\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/\",\"name\":\"KENNEDY TUNNEL MADE TO 70% - R\u00fabrica Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#website\"},\"datePublished\":\"2017-04-26T23:52:11+00:00\",\"dateModified\":\"2018-03-13T11:01:45+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/kennedy-tunnel-made-to-70\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"KENNEDY TUNNEL MADE TO 70%\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\",\"name\":\"R\u00fabrica Engineering\",\"description\":\"Intelligent construction methods for civil works\",\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\",\"name\":\"R\u00fabrica Engineering\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"width\":864,\"height\":173,\"caption\":\"R\u00fabrica Engineering\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rubricaengineering\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/person\\\/193e750075a72fd33c170626739bf8e9\",\"name\":\"adminrub\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g\",\"caption\":\"adminrub\"},\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/author\\\/adminrub\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"KENNEDY TUNNEL MADE TO 70% - R\u00fabrica Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/","og_locale":"en_US","og_type":"article","og_title":"KENNEDY TUNNEL MADE TO 70% - R\u00fabrica Engineering","og_description":"&#8220;Nearly a year ahead of schedule, the Kennedy tunnel will be inaugurated, a work that will unite the Perez Zujovic bridge sector with Am\u00e9rico Vespucio in Las Condes. The bridge is part of the Santiago Centro-Oriente Plan that builds the concessionaire Costanera Norte and seeks to improve the vehicular flows of that sector. This was [&hellip;]","og_url":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/","og_site_name":"R\u00fabrica Engineering","article_published_time":"2017-04-26T23:52:11+00:00","article_modified_time":"2018-03-13T11:01:45+00:00","author":"adminrub","twitter_card":"summary_large_image","twitter_misc":{"Written by":"adminrub","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/#article","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/"},"author":{"name":"adminrub","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/person\/193e750075a72fd33c170626739bf8e9"},"headline":"KENNEDY TUNNEL MADE TO 70%","datePublished":"2017-04-26T23:52:11+00:00","dateModified":"2018-03-13T11:01:45+00:00","mainEntityOfPage":{"@id":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/"},"wordCount":222,"commentCount":0,"publisher":{"@id":"https:\/\/rubricaingenieria.com\/en\/#organization"},"keywords":["Kennedy Tunnel"],"articleSection":["Rubrica Tunnel"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/","url":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/","name":"KENNEDY TUNNEL MADE TO 70% - R\u00fabrica Engineering","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/en\/#website"},"datePublished":"2017-04-26T23:52:11+00:00","dateModified":"2018-03-13T11:01:45+00:00","breadcrumb":{"@id":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/rubricaingenieria.com\/en\/kennedy-tunnel-made-to-70\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/rubricaingenieria.com\/en\/"},{"@type":"ListItem","position":2,"name":"KENNEDY TUNNEL MADE TO 70%"}]},{"@type":"WebSite","@id":"https:\/\/rubricaingenieria.com\/en\/#website","url":"https:\/\/rubricaingenieria.com\/en\/","name":"R\u00fabrica Engineering","description":"Intelligent construction methods for civil works","publisher":{"@id":"https:\/\/rubricaingenieria.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rubricaingenieria.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rubricaingenieria.com\/en\/#organization","name":"R\u00fabrica Engineering","url":"https:\/\/rubricaingenieria.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","width":864,"height":173,"caption":"R\u00fabrica Engineering"},"image":{"@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rubricaengineering"]},{"@type":"Person","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/person\/193e750075a72fd33c170626739bf8e9","name":"adminrub","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/02f7796d89a6fcea7ca01fccf8a26dc8a74bb02ebf3af4853e623631d1fff7a8?s=96&d=mm&r=g","caption":"adminrub"},"url":"https:\/\/rubricaingenieria.com\/en\/author\/adminrub\/"}]}},"_links":{"self":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/2289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/comments?post=2289"}],"version-history":[{"count":0,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/2289\/revisions"}],"wp:attachment":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/media?parent=2289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/categories?post=2289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/tags?post=2289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}