{"id":13337,"date":"2021-09-28T15:34:26","date_gmt":"2021-09-28T13:34:26","guid":{"rendered":"https:\/\/rubricaingenieria.com\/?p=13337"},"modified":"2021-09-28T15:34:26","modified_gmt":"2021-09-28T13:34:26","slug":"tunnel-opened-new-tunnel-formwork-in-assembly","status":"publish","type":"post","link":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/","title":{"rendered":"Tunnel opened &#8211; new tunnel formwork in assembly"},"content":{"rendered":"<p class=\"p1\">In a few days, the short tunnel of the Line &#8211; Carmelitas (T\u00faneles Proyecto Consorcio La L\u00ednea 042) will enter into service.<\/p>\n<p class=\"p1\">This infrastructure is included within the well-known \u201cCruce de la Cordillera Central\u201d project, which, together with others, will facilitate traffic on Ruta Nacional 40.<\/p>\n<p class=\"p1\">For us, the work began in 2018, designing and manufacturing a self-supporting tunnel formwork equipment with the possibility of changing the section, and with caterpillars to move through the difficult terrain between the different sections.<\/p>\n<p class=\"p1\">The main challenge we faced was to get an equipment that was capable of advancing through unpaved terrain and with slopes of 11%, as well as its adaptation to the different sections.<\/p>\n<p class=\"p2\"><span class=\"s1\">See all the project: <a href=\"https:\/\/rubricaingenieria.com\/en\/rubrica-proyecto\/bored-tunnel-formwork-la-linea-carmelitas\/\">https:\/\/rubricaingenieria.com\/en\/rubrica-proyecto\/bored-tunnel-formwork-la-linea-carmelitas\/<\/a><\/span><\/p>\n<p class=\"p1\">On the other hand, we have started the assembly phase of a new project, the Toyo Short Tunnel, also in Colombia.<\/p>\n<p class=\"p1\">El T\u00fanel del Toyo is a mega-project of road infrastructure located in the department of Antioquia, Colombia. The project is articulated with the 4G Toll Roads, specifically the Mar 1 and Mar 21 roads located west of Antioquia. This seeks to connect the cities and production centers of the interior of the country with the sea of Urab\u00e1 and the ports that are being built in this region. At the end of the construction of the main tunnel, it would be the longest in the American continent, surpassing the Line Tunnel (8,580 m) and the Oriente Tunnel (8,200 m), also located in Colombia.<\/p>\n<p>See some images:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-13341 alignleft\" src=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.45-1-300x225.jpeg\" alt=\"\" width=\"300\" height=\"225\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13344 alignleft\" src=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.45-4-225x300.jpeg\" alt=\"\" width=\"218\" height=\"291\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a few days, the short tunnel of the Line &#8211; Carmelitas (T\u00faneles Proyecto Consorcio La L\u00ednea 042) will enter into service. This infrastructure is included within the well-known \u201cCruce de la Cordillera Central\u201d project, which, together with others, will facilitate traffic on Ruta Nacional 40. For us, the work began in 2018, designing and [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":13338,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[89,45],"tags":[490,216,491],"class_list":["post-13337","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticia-destacada","category-rubrica-tunnel-n","tag-la-linea-tunnel","tag-rubrica-tunnels","tag-toyo-tunnel"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel opened - new tunnel formwork in assembly - R\u00fabrica Engineering<\/title>\n<meta name=\"description\" content=\"R\u00fabrica Engineering design and produced special formwork equipment for civil works, being specialist in tunnel formworks\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel opened - new tunnel formwork in assembly - R\u00fabrica Engineering\" \/>\n<meta property=\"og:description\" content=\"R\u00fabrica Engineering design and produced special formwork equipment for civil works, being specialist in tunnel formworks\" \/>\n<meta property=\"og:url\" content=\"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/\" \/>\n<meta property=\"og:site_name\" content=\"R\u00fabrica Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-28T13:34:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"495\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Pablo Urbea\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pablo Urbea\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/\"},\"author\":{\"name\":\"Pablo Urbea\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/person\\\/11264a6b9722591dbe8a6baf4214ed65\"},\"headline\":\"Tunnel opened &#8211; new tunnel formwork in assembly\",\"datePublished\":\"2021-09-28T13:34:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/\"},\"wordCount\":253,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg\",\"keywords\":[\"La L\u00ednea Tunnel\",\"Rubrica tunnels\",\"Toyo Tunnel\"],\"articleSection\":[\"News Highlights\",\"Rubrica Tunnel\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/\",\"name\":\"Tunnel opened - new tunnel formwork in assembly - R\u00fabrica Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg\",\"datePublished\":\"2021-09-28T13:34:26+00:00\",\"description\":\"R\u00fabrica Engineering design and produced special formwork equipment for civil works, being specialist in tunnel formworks\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#primaryimage\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg\",\"width\":1080,\"height\":495},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/tunnel-opened-new-tunnel-formwork-in-assembly\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tunnel opened &#8211; new tunnel formwork in assembly\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\",\"name\":\"R\u00fabrica Engineering\",\"description\":\"Intelligent construction methods for civil works\",\"publisher\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#organization\",\"name\":\"R\u00fabrica Engineering\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"contentUrl\":\"https:\\\/\\\/rubricaingenieria.com\\\/wp-content\\\/uploads\\\/2020\\\/10\\\/Rubrica.png\",\"width\":864,\"height\":173,\"caption\":\"R\u00fabrica Engineering\"},\"image\":{\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rubricaengineering\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/#\\\/schema\\\/person\\\/11264a6b9722591dbe8a6baf4214ed65\",\"name\":\"Pablo Urbea\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g\",\"caption\":\"Pablo Urbea\"},\"url\":\"https:\\\/\\\/rubricaingenieria.com\\\/en\\\/author\\\/purbea\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel opened - new tunnel formwork in assembly - R\u00fabrica Engineering","description":"R\u00fabrica Engineering design and produced special formwork equipment for civil works, being specialist in tunnel formworks","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/","og_locale":"en_US","og_type":"article","og_title":"Tunnel opened - new tunnel formwork in assembly - R\u00fabrica Engineering","og_description":"R\u00fabrica Engineering design and produced special formwork equipment for civil works, being specialist in tunnel formworks","og_url":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/","og_site_name":"R\u00fabrica Engineering","article_published_time":"2021-09-28T13:34:26+00:00","og_image":[{"width":1080,"height":495,"url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg","type":"image\/jpeg"}],"author":"Pablo Urbea","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Pablo Urbea","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#article","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/"},"author":{"name":"Pablo Urbea","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/person\/11264a6b9722591dbe8a6baf4214ed65"},"headline":"Tunnel opened &#8211; new tunnel formwork in assembly","datePublished":"2021-09-28T13:34:26+00:00","mainEntityOfPage":{"@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/"},"wordCount":253,"commentCount":0,"publisher":{"@id":"https:\/\/rubricaingenieria.com\/en\/#organization"},"image":{"@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg","keywords":["La L\u00ednea Tunnel","Rubrica tunnels","Toyo Tunnel"],"articleSection":["News Highlights","Rubrica Tunnel"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/","url":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/","name":"Tunnel opened - new tunnel formwork in assembly - R\u00fabrica Engineering","isPartOf":{"@id":"https:\/\/rubricaingenieria.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#primaryimage"},"image":{"@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#primaryimage"},"thumbnailUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg","datePublished":"2021-09-28T13:34:26+00:00","description":"R\u00fabrica Engineering design and produced special formwork equipment for civil works, being specialist in tunnel formworks","breadcrumb":{"@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#primaryimage","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2021\/09\/WhatsApp-Image-2021-09-27-at-09.37.24.jpeg","width":1080,"height":495},{"@type":"BreadcrumbList","@id":"https:\/\/rubricaingenieria.com\/en\/tunnel-opened-new-tunnel-formwork-in-assembly\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/rubricaingenieria.com\/en\/"},{"@type":"ListItem","position":2,"name":"Tunnel opened &#8211; new tunnel formwork in assembly"}]},{"@type":"WebSite","@id":"https:\/\/rubricaingenieria.com\/en\/#website","url":"https:\/\/rubricaingenieria.com\/en\/","name":"R\u00fabrica Engineering","description":"Intelligent construction methods for civil works","publisher":{"@id":"https:\/\/rubricaingenieria.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/rubricaingenieria.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/rubricaingenieria.com\/en\/#organization","name":"R\u00fabrica Engineering","url":"https:\/\/rubricaingenieria.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","contentUrl":"https:\/\/rubricaingenieria.com\/wp-content\/uploads\/2020\/10\/Rubrica.png","width":864,"height":173,"caption":"R\u00fabrica Engineering"},"image":{"@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/rubricaengineering"]},{"@type":"Person","@id":"https:\/\/rubricaingenieria.com\/en\/#\/schema\/person\/11264a6b9722591dbe8a6baf4214ed65","name":"Pablo Urbea","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3201a0891ab0ec5a1afa621dd057675a962471e2c2b0161de88b6271578643b8?s=96&d=mm&r=g","caption":"Pablo Urbea"},"url":"https:\/\/rubricaingenieria.com\/en\/author\/purbea\/"}]}},"_links":{"self":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/13337","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/comments?post=13337"}],"version-history":[{"count":1,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/13337\/revisions"}],"predecessor-version":[{"id":13347,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/13337\/revisions\/13347"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/media\/13338"}],"wp:attachment":[{"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/media?parent=13337"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/categories?post=13337"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rubricaingenieria.com\/en\/wp-json\/wp\/v2\/tags?post=13337"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}