WHAT WE DO
Rúbrica Engineering designed and produced special equipment for in-place casting of bridges, precast moulds, self-launching falsework, tunnel forms, special systems and unique projects
Our competence fields are:








RUBRICA INNOVATION
We work in unique projects, where the innovation and advanced technology is the difference.
NEWS
- August 10, 2022Fehmarnbelt Tunnel, the world's longest immersed tunnel!We are delighted to share the exciting news of our collaboration on the impressive Fehmarnbelt Tunnel, the world's longest immersed tunnel!. Meva Formworks has partnered with Rúbrica to supply the necessary formwork for the construction of the 10 special elements...
- June 7, 2022First steps of our formwork equipment for the Guillermo Gaviria Echeverri tunnel(The Tunnel Guillermo Gaviria Echeverri is the Main tunnel of the Toyo Tunnel)The Toyo tunnel is a mega road infrastructure project located in the department of Antioquia, Colombia. The project is articulated with the 4G Highways, specifically the Vías Mar...
- May 10, 2022Tunnel formwork for the construction of the connecting galleries in the Rastatt tunnelsTunnel formworkThe project has 8 connecting galleries with similar geometries but different dimensions between them. The construction of each gallery is divided into four phases of execution due to the fact that it has different sections. The 4 phases of...
- September 28, 2021Tunnel opened - new tunnel formwork in assemblyIn a few days, the short tunnel of the Line - Carmelitas (Túneles Proyecto Consorcio La Línea 042) will enter into service.This infrastructure is included within the well-known “Cruce de la Cordillera Central” project, which, together with others, will facilitate...
- June 15, 2021Specialized in self-supporting tunnel formworkSelf-supporting tunnel formwork is a system for casting the tunnel vault. It is robust and reliable, and moves autonomously over the grade, attaching itself to the base beam during the casting process.It consists of a shell or metal mold formed...
- March 30, 2021Assembly of the Pamplona Tunnel formworkAssembly description of the Pamplona Tunnel formworkTunnel formwork in mine for the construction work of the Pamplona - Cúcuta highway located in Colombia.The formwork of 15 m and radius 5.56 m has been supplied that circulates on railroad track, and...
- February 16, 2021Starting the works with the pile guidance structure in Paita (Perú)The pile guidance structure designed for the extension of the quay on piles to be executed by Etermar in the port of Paita, Peru, has already begun to operate with the driving of the first piles next to the existing...