Construction of the Mulatos tunnel in the Pacífico 2 connection highway concession in Colombia. The equipment is composed of one formwork and one traveller of radius 6.40 / 4.66 m, and advance 15m divisible into two independent formworks of 9 m and 6 m. It is supplied...