RÚBRICA MARITIME 2017, annual report
Two of the most important works carried out last year have been the formwork for a capping beam on a sheet-pile wall in the port of Haifa in Israel, the formwork have to execute three different alignments with different geometries and characteristics in each one of them. And the mixed formwork of self-launching system and floating tables for the construction of the Syncrolift wharf in the port of Barcelona.